IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,245

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0363 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $542 $1,568 Implemented
UM0362 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,058 $89,000 Implemented
UM0362 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $12,351 $500 Implemented
UM0362 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,185 $400 Implemented
UM0362 # 05 Y:2010 05 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,961 $3,048 Implemented
UM0362 # 07 Y:2010 07 2010 INSTALL STORM WINDOWS AND DOORS $3,301 $3,000 Implemented
UM0362 # 08 Y:2010 08 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,257 $2,000 Implemented
UM0361 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,000 $31,000 Implemented
UM0361 # 04 Y:2010 04 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,484 $1,200 Implemented
UM0361 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,522 $600 Implemented
UM0361 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,227 $650 Implemented
UM0361 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $1,137 $5,520 Implemented
UM0361 # 09 Y:2010 09 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $396 $400 Implemented
UM0361 # 10 Y:2010 10 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $355 $750 Implemented
UM0359 # 01 Y:2009 01 2009 REDUCE VENTILATION AIR $20,146 $500 Implemented
UM0359 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,026 $50,000 Implemented
UM0359 # 03 Y:2009 03 2009 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $13,963 $400 Implemented
UM0359 # 05 Y:2009 05 2009 INSTALL STORM WINDOWS AND DOORS $6,298 $24,510 Implemented
UM0359 # 08 Y:2009 08 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,620 $10,000 Implemented
UM0359 # 09 Y:2009 09 2009 INSTALL OCCUPANCY SENSORS $1,161 $30,000 Implemented
UM0359 # 10 Y:2009 10 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $472 $10,000 Implemented
UM0358 # 01 Y:2009 01 2009 ISOLATE HOT OR COLD EQUIPMENT $21,998 $720 Implemented
UM0358 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,988 $23,603 Implemented
UM0358 # 05 Y:2009 05 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $69 $62 Implemented
UM0358 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,552 $36,000 Implemented