Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0441 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,450 | $3,480 | Implemented |
UM0441 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,664 | $2,500 | Implemented |
UM0349 # 04 Y:2009 | 04 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $479 | $100 | Implemented |
UM0349 # 03 Y:2009 | 03 | 2009 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,531 | $3,168 | Implemented |
UM0349 # 02 Y:2009 | 02 | 2009 | INSTALL OCCUPANCY SENSORS | $5,172 | $1,840 | Implemented |
UM0349 # 01 Y:2009 | 01 | 2009 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $10,327 | $1,000 | Implemented |
UM0311 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,325 | $450 | Implemented |
UM0311 # 11 Y:2006 | 11 | 2006 | INSULATE BARE EQUIPMENT | $578 | $659 | Implemented |
UM0311 # 10 Y:2006 | 10 | 2006 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,316 | $370 | Implemented |
UM0311 # 09 Y:2006 | 09 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,525 | $375 | Implemented |
UM0311 # 08 Y:2006 | 08 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,983 | $1,000 | Implemented |
UM0311 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,319 | $6,620 | Implemented |
UM0270 # 05 Y:2004 | 05 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $196 | $400 | Implemented |
UM0270 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,108 | $11,108 | Implemented |
UM0268 # 02 Y:2004 | 02 | 2004 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $3,888 | $840 | Implemented |
UM0267 # 05 Y:2004 | 05 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,938 | $2,615 | Implemented |
UM0267 # 04 Y:2004 | 04 | 2004 | OPTIMIZE PLANT POWER FACTOR | $11,902 | $21,150 | Implemented |
UM0267 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,675 | $20,137 | Implemented |
UM0266 # 01 Y:2004 | 01 | 2004 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $11,825 | $4,500 | Implemented |
UM0266 # 10 Y:2004 | 10 | 2004 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $666 | $610 | Implemented |
UM0266 # 08 Y:2004 | 08 | 2004 | REVISE SMOKE CLEANUP FROM OPERATIONS | $1,614 | $500 | Implemented |
UM0266 # 05 Y:2004 | 05 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,847 | $2,000 | Implemented |
UM0266 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,042 | $900 | Implemented |
UM0266 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,131 | $7,512 | Implemented |