IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0441 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,450 $3,480 Implemented
UM0441 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,664 $2,500 Implemented
UM0349 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $479 $100 Implemented
UM0349 # 03 Y:2009 03 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,531 $3,168 Implemented
UM0349 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $5,172 $1,840 Implemented
UM0349 # 01 Y:2009 01 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,327 $1,000 Implemented
UM0311 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,325 $450 Implemented
UM0311 # 11 Y:2006 11 2006 INSULATE BARE EQUIPMENT $578 $659 Implemented
UM0311 # 10 Y:2006 10 2006 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,316 $370 Implemented
UM0311 # 09 Y:2006 09 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,525 $375 Implemented
UM0311 # 08 Y:2006 08 2006 RECOVER WASTE HEAT FROM EQUIPMENT $2,983 $1,000 Implemented
UM0311 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,319 $6,620 Implemented
UM0270 # 05 Y:2004 05 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $196 $400 Implemented
UM0270 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,108 $11,108 Implemented
UM0268 # 02 Y:2004 02 2004 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $3,888 $840 Implemented
UM0267 # 05 Y:2004 05 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,938 $2,615 Implemented
UM0267 # 04 Y:2004 04 2004 OPTIMIZE PLANT POWER FACTOR $11,902 $21,150 Implemented
UM0267 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,675 $20,137 Implemented
UM0266 # 01 Y:2004 01 2004 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $11,825 $4,500 Implemented
UM0266 # 10 Y:2004 10 2004 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $666 $610 Implemented
UM0266 # 08 Y:2004 08 2004 REVISE SMOKE CLEANUP FROM OPERATIONS $1,614 $500 Implemented
UM0266 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,847 $2,000 Implemented
UM0266 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,042 $900 Implemented
UM0266 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,131 $7,512 Implemented