IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,732

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0160 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $7,300 $500 Implemented
UM0160 # 06 Y:2000 06 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,600 $300 Not Implemented
UM0159 # 01 Y:2000 01 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,800 $200 Implemented
UM0159 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $172 $50 Implemented
UM0159 # 03 Y:2000 03 2000 ADJUST BURNERS FOR EFFICIENT OPERATION $10,836 $3,000 Implemented
UM0159 # 04 Y:2000 04 2000 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $4,390 $4,000 Implemented
UM0159 # 05 Y:2000 05 2000 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $4,800 $8,000 Implemented
UM0159 # 06 Y:2000 06 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $88,447 $27,000 Implemented
UM0159 # 07 Y:2000 07 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $95,726 $35,000 Not Implemented
UM0158 # 01 Y:2000 01 2000 REPAIR OR REPLACE STEAM TRAPS $67,296 $2,200 Implemented
UM0158 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,190 $1,400 Not Implemented
UM0158 # 03 Y:2000 03 2000 INCREASE AMOUNT OF CONDENSATE RETURNED $138,702 $86,970 Implemented
UM0158 # 04 Y:2000 04 2000 REDUCE EXCESSIVE BOILER BLOWDOWN $11,891 $9,860 Not Implemented
UM0158 # 05 Y:2000 05 2000 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $106,009 $100,000 Not Implemented
UM0158 # 06 Y:2000 06 2000 REDUCE FLUID FLOW RATES $40,377 $1,000 Not Implemented
UM0158 # 07 Y:2000 07 2000 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $364,003 $3,000,000 Not Implemented
UM0157 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,161 $150 Implemented
UM0157 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $746 $500 Implemented
UM0157 # 03 Y:2000 03 2000 REDUCE EXCESSIVE BOILER BLOWDOWN $1,224 $4,430 Implemented
UM0157 # 04 Y:2000 04 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $8,000 $400 Not Implemented
UM0157 # 05 Y:2000 05 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,296 $738 Implemented
UM0156 # 01 Y:2000 01 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $428 $500 Implemented
UM0156 # 02 Y:2000 02 2000 DISCONNECT BALLASTS $1,786 $0 Implemented
UM0156 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,860 $48,600 Not Implemented
UM0156 # 04 Y:2000 04 2000 REDUCE EXCESSIVE BOILER BLOWDOWN $1,813 $4,430 Not Implemented