IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,094

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0133 # 06 Y:1999 06 1999 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $307,747 $800,000 n/a
UM0133 # 07 Y:1999 07 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $25,360 $15,700 Not Implemented
UM0132 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,280 $7,301 Implemented
UM0132 # 02 Y:1999 02 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $680 $700 Implemented
UM0132 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $667 $300 Implemented
UM0132 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $349 $1,000 Implemented
UM0132 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $815 $990 Implemented
UM0132 # 06 Y:1999 06 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $13,503 $3,700 Implemented
UM0132 # 07 Y:1999 07 1999 USE LOW VOC OR WATER BASED PAINT $5,439 $500 Implemented
UM0132 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $53,333 $1,548 Not Implemented
UM0131 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,173 $10,972 n/a
UM0131 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $616 $1,400 n/a
UM0131 # 03 Y:1999 03 1999 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,228 $0 n/a
UM0131 # 04 Y:1999 04 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $202 $510 n/a
UM0131 # 05 Y:1999 05 1999 REPAIR OR REPLACE STEAM TRAPS $2,646 $5,280 n/a
UM0131 # 06 Y:1999 06 1999 INCREASE AMOUNT OF CONDENSATE RETURNED $14,658 $6,690 n/a
UM0131 # 07 Y:1999 07 1999 METER WASTE WATER $2,154 $500 n/a
UM0131 # 08 Y:1999 08 1999 CLEAR AND RENT EXISTING SPACE $63,991 $63,991 n/a
UM0130 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $662 $0 Not Implemented
UM0130 # 02 Y:1999 02 1999 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,970 $0 Implemented
UM0130 # 03 Y:1999 03 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,200 $3,500 Not Implemented
UM0130 # 04 Y:1999 04 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $11,820 $0 Implemented
UM0130 # 05 Y:1999 05 1999 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $3,807 $0 Not Implemented
UM0130 # 06 Y:1999 06 1999 EXPAND OPERATIONS INTO UNUSED SPACE $65,700 $123,450 Not Implemented
UM0129 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,119 $13,195 Not Implemented