IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

777

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0835 # 04 Y:2022 04 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $680 $750 Implemented
MA0835 # 02 Y:2022 02 2022 USE HEAT PUMP FOR SPACE CONDITIONING $2,773 $7,150 Implemented
MA0835 # 01 Y:2022 01 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,572 $40,722 Implemented
MA0836 # 08 Y:2022 08 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,781 $625 Implemented
MA0836 # 03 Y:2022 03 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $9,895 $23,950 Implemented
MA0836 # 05 Y:2022 05 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,531 $1,500 Implemented
MA0836 # 06 Y:2022 06 2022 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $7,372 $500 Implemented
MA0836 # 07 Y:2022 07 2022 USE HEAT PUMP FOR SPACE CONDITIONING $2,777 $7,150 Implemented
MA0739 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,543 $500 Implemented
MA0739 # 03 Y:2015 03 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $927 $1,570 Implemented
MA0739 # 04 Y:2015 04 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $880 $1,285 Implemented
MA0739 # 07 Y:2015 07 2015 PAY UTILITY BILLS ON TIME $426 $500 Implemented
MA0723 # 01 Y:2014 01 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $23,304 $90,000 Implemented
MA0723 # 02 Y:2014 02 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $20,745 $110,500 Implemented
MA0723 # 03 Y:2014 03 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $16,628 $5,000 Implemented
MA0723 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,158 $1,250 Implemented
MA0565 # 04 Y:2004 04 2004 REPLACE BOILER $2,760 $750 Implemented
MA0565 # 06 Y:2004 06 2004 INSULATE FEEDWATER TANK $873 $300 Implemented
MA0565 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $2,705 $754 Implemented
MA0565 # 01 Y:2004 01 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $216,000 $125,000 Implemented
MA0565 # 02 Y:2004 02 2004 $57,540 $40,000 Implemented
MA0564 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $122 $548 Implemented
MA0563 # 01 Y:2004 01 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $39,550 $12,000 Implemented
MA0563 # 02 Y:2004 02 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,769 $650 Implemented
MA0563 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $116 $0 Implemented