IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,622

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0062 # 01 Y:1982 01 1982 INSULATE BARE EQUIPMENT $82 $450 Implemented
OK0062 # 02 Y:1982 02 1982 USE MINIMUM SAFE OVEN VENTILATION $1,749 $0 Implemented
OK0062 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $337 $285 Implemented
OK0062 # 04 Y:1982 04 1982 INSTALL TIMERS AND/OR THERMOSTATS $909 $599 Implemented
OK0062 # 05 Y:1982 05 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $130 $690 Implemented
OK0065 # 03 Y:1982 03 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $672 $110 Implemented
OK0065 # 04 Y:1982 04 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,942 $2,288 Implemented
OK0059 # 04 Y:1982 04 1982 LOWER CEILING TO REDUCE CONDITIONED SPACE $230 $1,137 Implemented
OK0059 # 06 Y:1982 06 1982 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,097 $984 Implemented
OK0060 # 02 Y:1982 02 1982 INSTALL TIMERS AND/OR THERMOSTATS $436 $600 Implemented
OK0046 # 03 Y:1982 03 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,800 $148 Implemented
OK0048 # 03 Y:1982 03 1982 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $35 $17 Implemented
OK0051 # 01 Y:1982 01 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,367 $200 Implemented
OK0051 # 02 Y:1982 02 1982 RECOVER WASTE HEAT FROM EQUIPMENT $3,675 $3,000 Implemented
OK0051 # 05 Y:1982 05 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $130 $0 Implemented
OK0051 # 06 Y:1982 06 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29 $13 Implemented
OK0051 # 07 Y:1982 07 1982 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,612 $12,150 Implemented
OK0040 # 01 Y:1982 01 1982 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,020 $2,680 Implemented
OK0040 # 02 Y:1982 02 1982 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $1,682 $4,000 Implemented
OK0040 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,994 $922 Implemented
OK0040 # 04 Y:1982 04 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $360 $15 Implemented
OK0057 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,500 $500 Implemented
OK0057 # 03 Y:1982 03 1982 OPTIMIZE PLANT POWER FACTOR $20,704 $36,360 Implemented
OK0057 # 05 Y:1982 05 1982 COVER OPEN TANKS $640 $655 Implemented
OK0057 # 06 Y:1982 06 1982 INSTALL TIMERS AND/OR THERMOSTATS $4,092 $1,100 Implemented