IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,628

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0632 # 04 Y:2001 04 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,915 $0 Implemented
UD0632 # 05 Y:2001 05 2001 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $5,264 $0 Implemented
WV0224 # 01 Y:2001 01 2001 INCREASE AMOUNT OF CONDENSATE RETURNED $34,989 $13,233 Implemented
WV0224 # 04 Y:2001 04 2001 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,489 $2,436 Implemented
WV0224 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $1,215 $583 Implemented
WV0224 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $1,103 $120 Implemented
WV0224 # 07 Y:2001 07 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $13,668 $2,160 Implemented
WV0224 # 08 Y:2001 08 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $13,361 $2,160 Implemented
WV0224 # 11 Y:2001 11 2001 RECOVER AND REUSE COOLING WATER $25,740 $89,000 Implemented
UD0631 # 01 Y:2001 01 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $324,000 $1,600,000 Implemented
UD0631 # 02 Y:2001 02 2001 DEVELOP STANDARD OPERATING PROCEDURES $708,750 $350,000 Implemented
UD0631 # 03 Y:2001 03 2001 DEVELOP STANDARD OPERATING PROCEDURES $162,000 $48,000 Implemented
UD0631 # 06 Y:2001 06 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,670 $3,680 Implemented
UD0631 # 08 Y:2001 08 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,800 $960 Implemented
UD0631 # 09 Y:2001 09 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,671 $0 Implemented
UD0631 # 13 Y:2001 13 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $421 $688 Implemented
UD0630 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,607 $720 Implemented
UD0630 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $11,232 $5,000 Implemented
UD0630 # 03 Y:2001 03 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,449 $560 Implemented
UD0630 # 05 Y:2001 05 2001 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,639 $500 Implemented
UD0630 # 06 Y:2001 06 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,272 $88 Implemented
UD0630 # 07 Y:2001 07 2001 INSULATE BARE EQUIPMENT $611 $1,180 Implemented
UD0629 # 07 Y:2001 07 2001 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,907 $0 Implemented
UD0628 # 03 Y:2001 03 2001 OPTIMIZE PLANT POWER FACTOR $17,969 $9,000 Implemented
UD0628 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $11,223 $7,600 Implemented