IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,631

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0629 # 07 Y:2001 07 2001 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,907 $0 Implemented
UD0628 # 03 Y:2001 03 2001 OPTIMIZE PLANT POWER FACTOR $17,969 $9,000 Implemented
UD0628 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $11,223 $7,600 Implemented
UD0628 # 07 Y:2001 07 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,858 $0 Implemented
UD0628 # 09 Y:2001 09 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,097 $3,200 Implemented
WV0220 # 01 Y:2001 01 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,623 $3,010 Implemented
WV0220 # 02 Y:2001 02 2001 USE PHOTOCELL CONTROLS $432 $300 Implemented
WV0220 # 03 Y:2001 03 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,633 $540 Implemented
WV0220 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $804 $54 Implemented
WV0220 # 05 Y:2001 05 2001 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $241 $36 Implemented
WV0220 # 07 Y:2001 07 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,626 $190 Implemented
WV0220 # 10 Y:2001 10 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,164 $1,080 Implemented
WV0219 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $889 $100 Implemented
WV0219 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,960 $2,070 Implemented
WV0219 # 03 Y:2001 03 2001 UTILIZE A LESS EXPENSIVE COOLING METHOD $659 $1,140 Implemented
WV0219 # 04 Y:2001 04 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,765 $600 Implemented
WV0219 # 06 Y:2001 06 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,137 $21,787 Implemented
WV0219 # 08 Y:2001 08 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,318 $40 Implemented
WV0219 # 09 Y:2001 09 2001 INSULATE BARE EQUIPMENT $1,097 $64 Implemented
WV0219 # 13 Y:2001 13 2001 METER WASTE WATER $2,332 $800 Implemented
UD0626 # 02 Y:2001 02 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,653 $0 Implemented
UD0626 # 03 Y:2001 03 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,326 $1,000 Implemented
UD0626 # 04 Y:2001 04 2001 ADJUST VENTS TO MINIMIZE ENERGY USE $2,451 $112 Implemented
UD0626 # 05 Y:2001 05 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,173 $364 Implemented
UD0626 # 06 Y:2001 06 2001 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,158 $1,050 Implemented