Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,631
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0626 # 07 Y:2001 | 07 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,847 | $42 | Implemented |
UD0626 # 08 Y:2001 | 08 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,587 | $423 | Implemented |
UD0626 # 09 Y:2001 | 09 | 2001 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $860 | $250 | Implemented |
UD0626 # 10 Y:2001 | 10 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $580 | $2,526 | Implemented |
UD0625 # 01 Y:2001 | 01 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,708 | $55,000 | Implemented |
UD0625 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,972 | $315 | Implemented |
UD0625 # 03 Y:2001 | 03 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,095 | $4,500 | Implemented |
UD0625 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $5,466 | $2,880 | Implemented |
UD0625 # 08 Y:2001 | 08 | 2001 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $835 | $3,323 | Implemented |
UM0188 # 05 Y:2001 | 05 | 2001 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $3,333 | $1,500 | Implemented |
UD0624 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,975 | $13,704 | Implemented |
UD0624 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $980 | $414 | Implemented |
UD0623 # 02 Y:2001 | 02 | 2001 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $13,412 | $700 | Implemented |
UD0623 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $12,127 | $196 | Implemented |
UD0623 # 06 Y:2001 | 06 | 2001 | MINIMIZE WATER USAGE | $1,740 | $22 | Implemented |
UD0623 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,534 | $1,619 | Implemented |
UD0623 # 08 Y:2001 | 08 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $756 | $3,000 | Implemented |
UD0622 # 01 Y:2001 | 01 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $12,500 | $2,500 | Implemented |
UD0622 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,574 | $6,830 | Implemented |
UD0622 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $67 | $170 | Implemented |
UD0621 # 02 Y:2001 | 02 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,768 | $0 | Implemented |
UD0621 # 03 Y:2001 | 03 | 2001 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $7,723 | $0 | Implemented |
UD0621 # 05 Y:2001 | 05 | 2001 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,092 | $2,000 | Implemented |
UD0621 # 06 Y:2001 | 06 | 2001 | INSULATE BARE EQUIPMENT | $1,280 | $2,460 | Implemented |
UD0620 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,470 | $3,648 | Implemented |