IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,486

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0215 # 11 Y:2001 11 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $219,121 $0 Implemented
SF0215 # 15 Y:2001 15 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,003 $5,111 Implemented
LM0006 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,389 $450 Implemented
LM0006 # 07 Y:2001 07 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $48,228 $25,000 Implemented
LM0007 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,501 $630 Implemented
LM0007 # 03 Y:2001 03 2001 INSTALL SKYLIGHTS $1,567 $3,000 Implemented
LM0007 # 05 Y:2001 05 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $26,071 $150 Implemented
LM0007 # 07 Y:2001 07 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $29,913 $29,612 Implemented
LM0005 # 01 Y:2001 01 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $635 $100 Implemented
LM0005 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $587 $115 Implemented
SF0217 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,715 $0 Implemented
SF0217 # 02 Y:2001 02 2001 REPAIR AND ELIMINATE STEAM LEAKS $611 $0 Implemented
SF0217 # 03 Y:2001 03 2001 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $2,551 $248 Implemented
SF0217 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,181 $3,150 Implemented
SF0217 # 05 Y:2001 05 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,600 $1,761 Implemented
SF0217 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $730 $1,032 Implemented
SF0217 # 08 Y:2001 08 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,410 $15,510 Implemented
SD0277 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,030 $1,720 Implemented
SD0277 # 07 Y:2001 07 2001 INSULATE BARE EQUIPMENT $3,648 $7,000 Implemented
SD0277 # 11 Y:2001 11 2001 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $2,383 $2,000 Implemented
LM0004 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,547 $725 Implemented
LM0004 # 06 Y:2001 06 2001 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $666 $1,000 Implemented
LM0004 # 07 Y:2001 07 2001 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $44,800 $1,000 Implemented
SD0275 # 01 Y:2001 01 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,842 $1,000 Implemented
SD0275 # 05 Y:2001 05 2001 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,210 $0 Implemented