IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,686

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0456 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,800 $1,799 Implemented
IA0456 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $657 $50 Implemented
IA0456 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $565 $50 Implemented
IA0456 # 08 Y:2010 08 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,524 $0 Implemented
IA0455 # 01 Y:2010 01 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,148 $1,000 Implemented
IA0455 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $562 $14 Implemented
IA0455 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,112 $240 Implemented
IA0455 # 07 Y:2010 07 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $165 $112 Implemented
IA0455 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $6,632 $9,702 Implemented
IA0455 # 09 Y:2010 09 2010 INSTALL OCCUPANCY SENSORS $1,331 $3,960 Implemented
IA0455 # 12 Y:2010 12 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,138 $4,417 Implemented
IA0449 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,171 $500 Implemented
IA0449 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,181 $650 Implemented
IA0449 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,025 $28,980 Implemented
IA0449 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $229 $1,199 Implemented
IA0449 # 06 Y:2010 06 2010 INSULATE BARE EQUIPMENT $5,734 $1,910 Implemented
IA0448 # 01 Y:2010 01 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,064 $560 Implemented
IA0448 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $21,840 $1,000 Implemented
IA0448 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,736 $1,440 Implemented
IA0448 # 06 Y:2010 06 2010 REPAIR OR REPLACE STEAM TRAPS $2,798 $800 Implemented
IA0448 # 09 Y:2010 09 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,501 $6,360 Implemented
IA0442 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,623 $25 Implemented
IA0440 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,119 $2,112 Implemented
IA0440 # 02 Y:2009 02 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $241 $200 Implemented
IA0440 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $312 $72 Implemented