IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,410

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0672 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,777 $8,300 Implemented
MA0672 # 07 Y:2011 07 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,750 $0 Implemented
MA0673 # 01 Y:2011 01 2011 INSULATE BARE EQUIPMENT $4,145 $1,370 Implemented
MA0673 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,772 $540 Implemented
MA0673 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,078 $200 Implemented
MA0671 # 02 Y:2011 02 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $4,780 $3,550 Implemented
MA0671 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $740 $200 Implemented
MA0669 # 01 Y:2011 01 2011 REPLACE BOILER $28,774 $63,300 Implemented
MA0669 # 03 Y:2011 03 2011 OPTIMIZE PLANT POWER FACTOR $10,179 $11,190 Implemented
MA0669 # 04 Y:2011 04 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $7,848 $1,500 Implemented
MA0669 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $410 $550 Implemented
MA0667 # 03 Y:2011 03 2011 MODERATE COOLING TOWER OUTLET TEMPERATURE $11,694 $10,590 Implemented
MA0667 # 04 Y:2011 04 2011 REDUCE VENTILATION AIR $8,118 $0 Implemented
MA0667 # 05 Y:2011 05 2011 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,023 $250 Implemented
MA0667 # 10 Y:2011 10 2011 INSTALL AUTOMATIC STACK DAMPER $729 $180 Implemented
MA0666 # 03 Y:2010 03 2010 ADD AREA LIGHTING SWITCHES $1,900 $500 Implemented
MA0664 # 01 Y:2010 01 2010 OPTIMIZE PLANT POWER FACTOR $133,570 $55,950 Implemented
MA0664 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,084 $200 Implemented
MA0663 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $938 $600 Implemented
MA0662 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,395 $2,265 Implemented
MA0662 # 02 Y:2010 02 2010 REDUCE VENTILATION AIR $2,158 $3,935 Implemented
MA0662 # 05 Y:2010 05 2010 INSULATE BARE EQUIPMENT $1,011 $1,760 Implemented
MA0662 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $883 $1,500 Implemented
MA0662 # 07 Y:2010 07 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $680 $2,000 Implemented
MA0662 # 08 Y:2010 08 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $644 $640 Implemented