Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,075
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0167 # 05 Y:2016 | 05 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,407 | $125 | Implemented |
TT0167 # 07 Y:2016 | 07 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,887 | $3,000 | Implemented |
TT0167 # 08 Y:2016 | 08 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,764 | $500 | Implemented |
TT0173 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $60,623 | $598,903 | Implemented |
TT0173 # 06 Y:2016 | 06 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $30,000 | $3,000 | Implemented |
TT0173 # 12 Y:2016 | 12 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,121 | $2,000 | Implemented |
TT0171 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,961 | $156,286 | Implemented |
TT0171 # 03 Y:2016 | 03 | 2016 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $11,200 | $110,000 | Implemented |
TT0171 # 05 Y:2016 | 05 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $2,435 | $800 | Implemented |
TT0171 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $676 | $1,366 | Implemented |
TT0166 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,168 | $13,756 | Implemented |
TT0166 # 04 Y:2016 | 04 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,418 | $8,000 | Implemented |
TT0166 # 05 Y:2016 | 05 | 2016 | INSTALL SUB-METERING EQUIPMENT | $11,364 | $600 | Implemented |
TT0166 # 07 Y:2016 | 07 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,809 | $3,000 | Implemented |
TT0166 # 10 Y:2016 | 10 | 2016 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $138 | $120 | Implemented |
TT0165 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,405 | $88,306 | Implemented |
TT0165 # 03 Y:2016 | 03 | 2016 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $4,033 | $3,600 | Implemented |
TT0165 # 04 Y:2016 | 04 | 2016 | OPERATE BOILERS ON HIGH FIRE SETTING | $4,000 | $12,000 | Implemented |
TT0165 # 05 Y:2016 | 05 | 2016 | INSULATE BARE EQUIPMENT | $2,310 | $1,919 | Implemented |
TT0165 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $883 | $1,500 | Implemented |
TT0165 # 07 Y:2016 | 07 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $310 | $200 | Implemented |
TT0162 # 01 Y:2015 | 01 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $19,039 | $10,000 | Implemented |
TT0162 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,958 | $3,000 | Implemented |
TT0159 # 01 Y:2015 | 01 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,644 | $3,000 | Implemented |
TT0159 # 07 Y:2015 | 07 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $2,995 | $1,070 | Implemented |