Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,486
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0187 # 12 Y:2000 | 12 | 2000 | USE EVAPORATION TO CONCENTRATE MATERIAL | $3,564 | $5,500 | Implemented |
SF0186 # 03 Y:2000 | 03 | 2000 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $5,385 | $150 | Implemented |
SD0240 # 01 Y:2000 | 01 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $114,651 | $214,102 | Implemented |
SD0240 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,067 | $2,600 | Implemented |
SD0240 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $193 | $714 | Implemented |
SD0240 # 05 Y:2000 | 05 | 2000 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $6,552 | $6,000 | Implemented |
SF0185 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,221 | $0 | Implemented |
SF0185 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,017 | $14,420 | Implemented |
SF0185 # 06 Y:2000 | 06 | 2000 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $1,818 | $0 | Implemented |
SD0239 # 02 Y:2000 | 02 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,716 | $0 | Implemented |
SD0239 # 05 Y:2000 | 05 | 2000 | IMPROVE SPACE COMFORT CONDITIONING | $40,500 | $7,500 | Implemented |
SD0237 # 01 Y:2000 | 01 | 2000 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $28,985 | $88,000 | Implemented |
SD0237 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,408 | $2,800 | Implemented |
SD0237 # 03 Y:2000 | 03 | 2000 | REDUCE EXCESSIVE BOILER BLOWDOWN | $688 | $100 | Implemented |
SD0237 # 07 Y:2000 | 07 | 2000 | MINIMIZE WATER USAGE | $646 | $100 | Implemented |
SD0237 # 08 Y:2000 | 08 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $40,972 | $7,200 | Implemented |
NV0146 # 02 Y:2000 | 02 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,042 | $2,074 | Implemented |
NV0146 # 03 Y:2000 | 03 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $207 | $0 | Implemented |
SD0236 # 02 Y:2000 | 02 | 2000 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $271,210 | $1,150,000 | Implemented |
SD0236 # 04 Y:2000 | 04 | 2000 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $862 | $388 | Implemented |
SD0236 # 05 Y:2000 | 05 | 2000 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $539 | $0 | Implemented |
NV0145 # 03 Y:1999 | 03 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,181 | $3,707 | Implemented |
NV0145 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,220 | $1,000 | Implemented |
NV0145 # 07 Y:1999 | 07 | 1999 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $13,552 | $640 | Implemented |
NV0145 # 08 Y:1999 | 08 | 1999 | MOVE PRODUCT USING MECHANICAL MEANS | $31,460 | $32,800 | Implemented |