IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,629

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UMS008 # 01 Y:2012 01 2012 RECOVER WASTE HEAT FROM EQUIPMENT $265,000 $400,000 Implemented
UMS007 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $480,000 $800,000 Implemented
UMS006 # 03 Y:2012 03 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $28,000 $10,000 Implemented
UM0399 # 01 Y:2012 01 2012 UPGRADE CONTROLS ON COMPRESSORS $5,760 $200 Implemented
UM0399 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,275 $1,300 Implemented
UM0399 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $500 $1,000 Implemented
UM0399 # 04 Y:2012 04 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,480 $3,200 Implemented
UM0399 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,010 $15,800 Implemented
UM0399 # 06 Y:2012 06 2012 REDUCE VENTILATION AIR $11,000 $10,000 Implemented
UM0397 # 03 Y:2011 03 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $239 $10 Implemented
UM0397 # 01 Y:2011 01 2011 UPGRADE CONTROLS ON COMPRESSORS $5,033 $200 Implemented
UM0398 # 03 Y:2011 03 2011 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,186 $0 Implemented
UM0398 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $1,482 $1,157 Implemented
UM0398 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $3,477 $500 Implemented
UM0394 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,147 $200 Implemented
UM0394 # 05 Y:2011 05 2011 INSULATE BARE EQUIPMENT $1,971 $2,584 Implemented
UM0393 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,825 $18,696 Implemented
UM0393 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,125 $29,225 Implemented
UM0393 # 04 Y:2011 04 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,581 $2,500 Implemented
UM0393 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,888 $5,440 Implemented
UM0393 # 08 Y:2011 08 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,408 $1,533 Implemented
UM0393 # 09 Y:2011 09 2011 INSTALL OCCUPANCY SENSORS $1,916 $1,200 Implemented
UM0393 # 12 Y:2011 12 2011 INSULATE BARE EQUIPMENT $12,938 $600 Implemented
UM0392 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,168 $54,459 Implemented
UM0392 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $9,765 $5,250 Implemented