Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,427
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0615 # 07 Y:2007 | 07 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,155 | $0 | Implemented |
MA0615 # 09 Y:2007 | 09 | 2007 | OPTIMIZE PLANT POWER FACTOR | $4,673 | $18,500 | Implemented |
MA0615 # 10 Y:2007 | 10 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,121 | $3,200 | Implemented |
MA0614 # 01 Y:2007 | 01 | 2007 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $16,978 | $5,000 | Implemented |
MA0614 # 02 Y:2007 | 02 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,036 | $8,400 | Implemented |
MA0614 # 03 Y:2007 | 03 | 2007 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $12,870 | $0 | Implemented |
MA0614 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,118 | $1,600 | Implemented |
MA0614 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,749 | $31,477 | Implemented |
MA0611 # 01 Y:2007 | 01 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $98,826 | $74,772 | Implemented |
MA0611 # 03 Y:2007 | 03 | 2007 | REDUCE VENTILATION AIR | $23,954 | $17,587 | Implemented |
MA0611 # 06 Y:2007 | 06 | 2007 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $3,833 | $5,368 | Implemented |
MA0611 # 07 Y:2007 | 07 | 2007 | INSULATE BARE EQUIPMENT | $3,330 | $3,300 | Implemented |
MA0608 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,557 | $91,980 | Implemented |
MA0608 # 04 Y:2006 | 04 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,294 | $36,000 | Implemented |
MA0608 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,784 | $150 | Implemented |
MA0608 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $1,575 | $2,925 | Implemented |
MA0608 # 08 Y:2006 | 08 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $712 | $1,500 | Implemented |
MA0606 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $130,688 | $6,000 | Implemented |
MA0605 # 02 Y:2006 | 02 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $17,280 | $975 | Implemented |
MA0605 # 03 Y:2006 | 03 | 2006 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,515 | $0 | Implemented |
MA0605 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,754 | $525 | Implemented |
MA0603 # 02 Y:2006 | 02 | 2006 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $54,146 | $2,000 | Implemented |
MA0603 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,920 | $83,405 | Implemented |
MA0603 # 04 Y:2006 | 04 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $34,778 | $8,125 | Implemented |
MA0603 # 07 Y:2006 | 07 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $16,595 | $83,500 | Implemented |