Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,719

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0506 # 02 Y:2006 02 2006 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $9,000 $2,100 Implemented
OR0506 # 03 Y:2006 03 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $6,000 $0 Implemented
OR0506 # 04 Y:2006 04 2006 ADD ADDITIONAL PRODUCTION SHIFT $11,400 $2,700 Implemented
OR0506 # 05 Y:2006 05 2006 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,200 $3,600 Implemented
OR0506 # 06 Y:2006 06 2006 PAY BILLS ON TIME TO AVOID LATE FEES $2,300 $0 Implemented
OR0503 # 01 Y:2006 01 2006 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $37,500 $42,500 Implemented
OR0503 # 03 Y:2006 03 2006 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $17,800 $36,000 Implemented
OR0503 # 04 Y:2006 04 2006 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $50,800 $11,300 Implemented
OR0503 # 05 Y:2006 05 2006 MAXIMIZE PRODUCTION RUNS TO REDUCE CLEANING $46,500 $0 Implemented
OR0503 # 06 Y:2006 06 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $5,341 $600 Implemented
OR0502 # 02 Y:2006 02 2006 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $5,700 $0 Implemented
OR0502 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,300 $6,300 Implemented
OR0502 # 04 Y:2006 04 2006 UPGRADE CONTROLS ON COMPRESSORS $18,300 $27,500 Implemented
OR0502 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $12,600 $48,600 Implemented
OR0502 # 06 Y:2006 06 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,280 $72,900 Implemented
OR0500 # 01 Y:2006 01 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $23,000 $31,500 Implemented
OR0500 # 02 Y:2006 02 2006 INSTALL COMMON HEADER ON COMPRESSORS $36,300 $31,500 Implemented
OR0500 # 03 Y:2006 03 2006 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $39,400 $42,000 Implemented
OR0501 # 01 Y:2006 01 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $119,000 $200 Implemented
OR0501 # 02 Y:2006 02 2006 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $72,600 $1 Implemented
OR0501 # 03 Y:2006 03 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $41,300 $59,700 Implemented
OR0501 # 04 Y:2006 04 2006 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $31,700 $105 Implemented
OR0501 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $8,560 $100 Implemented
OR0501 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,100 $0 Implemented
OR0499 # 01 Y:2006 01 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $77,273 $12,000 Implemented