IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

768

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0487 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $2,100 $104 Implemented
OR0484 # 03 Y:2005 03 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $847 $1,013 Implemented
OR0483 # 01 Y:2005 01 2005 RECOVER AND REUSE WASTE MATERIAL $21,624 $0 Implemented
OR0483 # 02 Y:2005 02 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $24,290 $4,400 Implemented
OR0483 # 03 Y:2005 03 2005 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $21,300 $5,100 Implemented
OR0483 # 04 Y:2005 04 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $8,960 $3,000 Implemented
OR0483 # 05 Y:2005 05 2005 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $41,000 $69,000 Implemented
OR0483 # 06 Y:2005 06 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $40,390 $72,000 Implemented
OR0481 # 03 Y:2005 03 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $25,000 $26,000 Implemented
OR0478 # 01 Y:2005 01 2005 OPTIMIZE PLANT POWER FACTOR $11,420 $6,400 Implemented
OR0478 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,500 $1,900 Implemented
OR0478 # 03 Y:2005 03 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,700 $49,100 Implemented
OR0477 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $28,455 $11,500 Implemented
OR0477 # 04 Y:2005 04 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,900 $3,100 Implemented
OR0477 # 05 Y:2005 05 2005 MODIFY MATERIAL APPLICATION METHODS $14,995 $1,875 Implemented
OR0477 # 06 Y:2005 06 2005 RECOVER AND REUSE WASTE MATERIAL $13,416 $25,000 Implemented
OR0477 # 08 Y:2005 08 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $48,200 $0 Implemented
OR0476 # 03 Y:2005 03 2005 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $9,028 $600 Implemented
OR0473 # 01 Y:2004 01 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $7,000 $7,000 Implemented
OR0473 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,500 $1,500 Implemented
OR0473 # 04 Y:2004 04 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,530 $2,200 Implemented
OR0449 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,830 $8,000 Implemented
OR0449 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,100 $2,600 Implemented
OR0438 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,850 $24,500 Implemented
OR0438 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,950 $0 Implemented