IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,492

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0148 # 05 Y:1998 05 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $40,673 $1,200 Implemented
AR0148 # 06 Y:1998 06 1998 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $39,295 $91,825 Implemented
AR0148 # 08 Y:1998 08 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $4,787 $1,000 Implemented
AR0144 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $530 $333 Implemented
AR0144 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,575 $160 Implemented
AR0143 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $269 $460 Implemented
AR0143 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $619 $0 Implemented
AR0143 # 04 Y:1998 04 1998 INSTALL SET-BACK TIMERS $1,859 $2,080 Implemented
AR0143 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,363 $150 Implemented
AR0143 # 07 Y:1998 07 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $6,960 $10,000 Implemented
AR0143 # 08 Y:1998 08 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $12,233 $2,000 Implemented
AR0143 # 09 Y:1998 09 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $19,710 $2,250 Implemented
AR0142 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $311 $655 Implemented
AR0142 # 02 Y:1998 02 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $866 $0 Implemented
AR0142 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $272 $186 Implemented
AR0142 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,472 $50 Implemented
AR0142 # 05 Y:1998 05 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $757 $652 Implemented
OK0551 # 01 Y:1998 01 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $898 $80,000 Implemented
OK0551 # 04 Y:1998 04 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,304 $0 Implemented
OK0551 # 05 Y:1998 05 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,522 $0 Implemented
OK0550 # 03 Y:1998 03 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,393 $1,945 Implemented
OK0550 # 04 Y:1998 04 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,343 $4,000 Implemented
OK0550 # 05 Y:1998 05 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $18,120 $0 Implemented
OK0550 # 07 Y:1998 07 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,071 $8,400 Implemented
OK0550 # 10 Y:1998 10 1998 INSULATE BARE EQUIPMENT $197 $134 Implemented