Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,622
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0731 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,083 | $68,849 | Implemented |
OK0730 # 02 Y:2006 | 02 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,500 | $1,237 | Implemented |
OK0730 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,533 | $3,500 | Implemented |
OK0730 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $150 | $767 | Implemented |
OK0730 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,886 | $1,767 | Implemented |
OK0727 # 01 Y:2006 | 01 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,431 | $2,462 | Implemented |
OK0727 # 02 Y:2006 | 02 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $1,646 | $75 | Implemented |
OK0727 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $14,689 | $7,635 | Implemented |
OK0723 # 01 Y:2006 | 01 | 2006 | OPERATE BOILERS ON HIGH FIRE SETTING | $23,600 | $18,000 | Implemented |
OK0723 # 03 Y:2006 | 03 | 2006 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,135 | $587 | Implemented |
OK0723 # 05 Y:2006 | 05 | 2006 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $3,531 | $5,250 | Implemented |
OK0723 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,876 | $17,879 | Implemented |
OK0723 # 08 Y:2006 | 08 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,096 | $42,002 | Implemented |
OK0722 # 03 Y:2006 | 03 | 2006 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $266 | $521 | Implemented |
OK0722 # 04 Y:2006 | 04 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,193 | $40 | Implemented |
OK0722 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,222 | $67,616 | Implemented |
OK0722 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,795 | $8,054 | Implemented |
OK0720 # 01 Y:2006 | 01 | 2006 | USE OPTIMUM TEMPERATURE | $10,475 | $1,000 | Implemented |
OK0720 # 02 Y:2006 | 02 | 2006 | ADJUST BURNERS FOR EFFICIENT OPERATION | $10,780 | $4,636 | Implemented |
OK0720 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $786 | $5,290 | Implemented |
OK0720 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,282 | $9,940 | Implemented |
OK0720 # 06 Y:2006 | 06 | 2006 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $5,200 | $0 | Implemented |
OK0719 # 02 Y:2006 | 02 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $13,491 | $550 | Implemented |
OK0719 # 03 Y:2006 | 03 | 2006 | USE OPTIMUM THICKNESS INSULATION | $3,078 | $1,637 | Implemented |
OK0719 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $282 | $80 | Implemented |