IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,622

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0731 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,083 $68,849 Implemented
OK0730 # 02 Y:2006 02 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,500 $1,237 Implemented
OK0730 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,533 $3,500 Implemented
OK0730 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $150 $767 Implemented
OK0730 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,886 $1,767 Implemented
OK0727 # 01 Y:2006 01 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,431 $2,462 Implemented
OK0727 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $1,646 $75 Implemented
OK0727 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $14,689 $7,635 Implemented
OK0723 # 01 Y:2006 01 2006 OPERATE BOILERS ON HIGH FIRE SETTING $23,600 $18,000 Implemented
OK0723 # 03 Y:2006 03 2006 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,135 $587 Implemented
OK0723 # 05 Y:2006 05 2006 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,531 $5,250 Implemented
OK0723 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,876 $17,879 Implemented
OK0723 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,096 $42,002 Implemented
OK0722 # 03 Y:2006 03 2006 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $266 $521 Implemented
OK0722 # 04 Y:2006 04 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,193 $40 Implemented
OK0722 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,222 $67,616 Implemented
OK0722 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,795 $8,054 Implemented
OK0720 # 01 Y:2006 01 2006 USE OPTIMUM TEMPERATURE $10,475 $1,000 Implemented
OK0720 # 02 Y:2006 02 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $10,780 $4,636 Implemented
OK0720 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $786 $5,290 Implemented
OK0720 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,282 $9,940 Implemented
OK0720 # 06 Y:2006 06 2006 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $5,200 $0 Implemented
OK0719 # 02 Y:2006 02 2006 REPAIR AND ELIMINATE STEAM LEAKS $13,491 $550 Implemented
OK0719 # 03 Y:2006 03 2006 USE OPTIMUM THICKNESS INSULATION $3,078 $1,637 Implemented
OK0719 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $282 $80 Implemented