Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,627
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0463 # 11 Y:2000 | 11 | 2000 | AUTOMATE FINISHING PROCESS | $37,380 | $30,000 | Implemented |
CO0460 # 01 Y:2000 | 01 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,940 | $7,500 | Implemented |
CO0460 # 04 Y:2000 | 04 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $430 | $670 | Implemented |
CO0460 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $240 | $600 | Implemented |
CO0460 # 06 Y:2000 | 06 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $200 | $210 | Implemented |
CO0460 # 08 Y:2000 | 08 | 2000 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $166,400 | $40,000 | Implemented |
CO0460 # 09 Y:2000 | 09 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $72,730 | $122,000 | Implemented |
CO0459 # 03 Y:2000 | 03 | 2000 | OPTIMIZE PLANT POWER FACTOR | $6,420 | $15,880 | Implemented |
CO0459 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,650 | $2,070 | Implemented |
CO0459 # 10 Y:2000 | 10 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $600 | $0 | Implemented |
CO0458 # 04 Y:2000 | 04 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,000 | $2,360 | Implemented |
CO0458 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $450 | $270 | Implemented |
CO0458 # 09 Y:2000 | 09 | 2000 | MOVE PRODUCT USING MECHANICAL MEANS | $5,280 | $6,720 | Implemented |
CO0457 # 01 Y:2000 | 01 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,380 | $7,500 | Implemented |
CO0457 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $660 | $0 | Implemented |
CO0457 # 04 Y:2000 | 04 | 2000 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $660 | $1,000 | Implemented |
CO0457 # 06 Y:2000 | 06 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $320 | $0 | Implemented |
CO0457 # 07 Y:2000 | 07 | 2000 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $5,100 | $1,510 | Implemented |
CO0449 # 01 Y:1999 | 01 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,410 | $66,360 | Implemented |
CO0449 # 02 Y:1999 | 02 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,830 | $10,000 | Implemented |
CO0449 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $700 | $280 | Implemented |
CO0449 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $60 | $0 | Implemented |
CO0449 # 06 Y:1999 | 06 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $18,110 | $3,600 | Implemented |
CO0449 # 07 Y:1999 | 07 | 1999 | PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) | $2,550 | $1,100 | Implemented |
CO0449 # 08 Y:1999 | 08 | 1999 | USE EVAPORATION TO CONCENTRATE MATERIAL | $1,160 | $3,300 | Implemented |