IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,624

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0460 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $240 $600 Implemented
CO0460 # 06 Y:2000 06 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $200 $210 Implemented
CO0460 # 08 Y:2000 08 2000 $166,400 $40,000 Implemented
CO0460 # 09 Y:2000 09 2000 $72,730 $122,000 Implemented
CO0459 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $6,420 $15,880 Implemented
CO0459 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,650 $2,070 Implemented
CO0459 # 10 Y:2000 10 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $600 $0 Implemented
CO0458 # 04 Y:2000 04 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,000 $2,360 Implemented
CO0458 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $450 $270 Implemented
CO0458 # 09 Y:2000 09 2000 $5,280 $6,720 Implemented
CO0457 # 01 Y:2000 01 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,380 $7,500 Implemented
CO0457 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $660 $0 Implemented
CO0457 # 04 Y:2000 04 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $660 $1,000 Implemented
CO0457 # 06 Y:2000 06 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $320 $0 Implemented
CO0457 # 07 Y:2000 07 2000 $5,100 $1,510 Implemented
CO0449 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,410 $66,360 Implemented
CO0449 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,830 $10,000 Implemented
CO0449 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $700 $280 Implemented
CO0449 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $60 $0 Implemented
CO0449 # 06 Y:1999 06 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $18,110 $3,600 Implemented
CO0449 # 07 Y:1999 07 1999 PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) $2,550 $1,100 Implemented
CO0449 # 08 Y:1999 08 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $1,160 $3,300 Implemented
CO0449 # 09 Y:1999 09 1999 $8,960 $620 Implemented
CO0450 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,800 $15,000 Implemented
CO0446 # 03 Y:1999 03 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $400 $1,000 Implemented