IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,564

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0037 # 05 Y:1988 05 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,732 $0 Implemented
WI0037 # 06 Y:1988 06 1988 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,189 $0 Implemented
WI0037 # 07 Y:1988 07 1988 RECOVER WASTE HEAT FROM EQUIPMENT $2,695 $1,500 Implemented
WI0038 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $953 $1,000 Implemented
WI0039 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,762 $0 Implemented
WI0039 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,771 $514 Implemented
WI0039 # 04 Y:1988 04 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,175 $1,400 Implemented
WI0039 # 05 Y:1988 05 1988 SHUT OFF PILOTS IN STANDBY EQUIPMENT $274 $0 Implemented
UD0268 # 01 Y:1988 01 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,113 $0 Implemented
UD0268 # 02 Y:1988 02 1988 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,128 $3,448 Implemented
UD0268 # 03 Y:1988 03 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,096 $3,000 Implemented
UD0268 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $281 $0 Implemented
UD0269 # 01 Y:1988 01 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $227 $0 Implemented
UD0269 # 02 Y:1988 02 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $830 $633 Implemented
UD0269 # 03 Y:1988 03 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $242 $500 Implemented
UD0269 # 04 Y:1988 04 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,782 $5,000 Implemented
UD0270 # 01 Y:1988 01 1988 REDESIGN PROCESS $3,796 $1,000 Implemented
UD0270 # 02 Y:1988 02 1988 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $1,575 $1,000 Implemented
UD0266 # 01 Y:1988 01 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,611 $600 Implemented
UD0266 # 02 Y:1988 02 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $462 $0 Implemented
UD0266 # 04 Y:1988 04 1988 REPAIR AND ELIMINATE STEAM LEAKS $21,603 $5,000 Implemented
UD0266 # 05 Y:1988 05 1988 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $23,169 $20,000 Implemented
UD0266 # 06 Y:1988 06 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,639 $11,475 Implemented
UD0266 # 07 Y:1988 07 1988 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,266 $30,000 Implemented
UD0267 # 01 Y:1988 01 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,625 $0 Implemented