IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

768

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0229 # 05 Y:1995 05 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $42,278 $66,500 Implemented
OR0218 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,336 $2,262 Implemented
OR0218 # 03 Y:1994 03 1994 OPTIMIZE PLANT POWER FACTOR $7,770 $10,000 Implemented
OR0218 # 04 Y:1994 04 1994 HEAT WATER WITH EXHAUST HEAT $4,938 $8,847 Implemented
OR0218 # 05 Y:1994 05 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $28,438 $35,000 Implemented
OR0219 # 01 Y:1994 01 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $697 $0 Implemented
OR0219 # 02 Y:1994 02 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $936 $165 Implemented
OR0204 # 01 Y:1994 01 1994 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $11,122 $5,000 Implemented
OR0204 # 02 Y:1994 02 1994 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $912 $3,000 Implemented
OR0204 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $7,860 $8,997 Implemented
OR0204 # 05 Y:1994 05 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $2,378 $1,394 Implemented
OR0204 # 06 Y:1994 06 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $376 $1,075 Implemented
OR0205 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $897 $2,000 Implemented
OR0205 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,085 $3,659 Implemented
OR0205 # 03 Y:1994 03 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,724 $6,475 Implemented
OR0205 # 06 Y:1994 06 1994 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $845 $0 Implemented
OR0205 # 07 Y:1994 07 1994 REDUCE SCRAP PRODUCTION $7,200 $16,420 Implemented
OR0193 # 01 Y:1993 01 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $29,170 $5,000 Implemented
OR0193 # 02 Y:1993 02 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,796 $0 Implemented
OR0193 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $158 $425 Implemented
OR0193 # 07 Y:1993 07 1993 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,806 $1,000 Implemented
OR0193 # 08 Y:1993 08 1993 AIR CONDITION ONLY SPACE NECESSARY $6,042 $6,116 Implemented
OR0193 # 09 Y:1993 09 1993 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $18,099 $39,000 Implemented
OR0192 # 01 Y:1993 01 1993 KEEP BOILER TUBES CLEAN $26,620 $4,000 Implemented
OR0192 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,496 $3,000 Implemented