Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,417
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0832 # 03 Y:2022 | 03 | 2022 | USE HEAT PUMP FOR SPACE CONDITIONING | $1,101 | $12,675 | Implemented |
MA0832 # 02 Y:2022 | 02 | 2022 | USE HEAT PUMP FOR SPACE CONDITIONING | $3,806 | $2,150 | Implemented |
MA0831 # 09 Y:2022 | 09 | 2022 | INSULATE FEEDWATER TANK | $798 | $1,376 | Implemented |
MA0831 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,657 | $42,058 | Implemented |
MA0831 # 05 Y:2022 | 05 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $41,831 | $1,000 | Implemented |
MA0831 # 03 Y:2022 | 03 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $42,489 | $9,040 | Implemented |
MA0829 # 06 Y:2022 | 06 | 2022 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $2,891 | $4,445 | Implemented |
MA0829 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,700 | $4,400 | Implemented |
MA0829 # 07 Y:2022 | 07 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,594 | $5,100 | Implemented |
MA0827 # 04 Y:2021 | 04 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,685 | $2,000 | Implemented |
MA0827 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,909 | $26,950 | Implemented |
MA0822 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,003 | $6,741 | Implemented |
MA0822 # 01 Y:2020 | 01 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $78,975 | $422,509 | Implemented |
MA0820 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $204 | $200 | Implemented |
MA0820 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $723 | $300 | Implemented |
MA0819 # 02 Y:2020 | 02 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $28,022 | $217,000 | Implemented |
MA0818 # 05 Y:2020 | 05 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $789 | $1,700 | Implemented |
MA0818 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,320 | $9,808 | Implemented |
MA0818 # 07 Y:2020 | 07 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $746 | $500 | Implemented |
MA0817 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $387 | $1,503 | Implemented |
MA0817 # 02 Y:2020 | 02 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,876 | $50 | Implemented |
MA0817 # 01 Y:2020 | 01 | 2020 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $2,919 | $5,650 | Implemented |
MA0816 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $917 | $4,629 | Implemented |
MA0815 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,596 | $24,389 | Implemented |
MA0815 # 03 Y:2020 | 03 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,675 | $375 | Implemented |