IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,486

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0556 # 01 Y:2017 01 2017 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $57,756 $205,000 Implemented
SD0556 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,198 $27,633 Implemented
SD0556 # 05 Y:2017 05 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $20,046 $53,400 Implemented
SD0556 # 06 Y:2017 06 2017 COVER OPEN TANKS $18,591 $10,800 Implemented
SD0556 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,514 $21,100 Implemented
SD0556 # 11 Y:2017 11 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,718 $1,300 Implemented
SD0556 # 12 Y:2017 12 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,902 $200 Implemented
SF0510 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $494 $90 Implemented
SF0510 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,182 $12,002 Implemented
SF0510 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,454 $9,120 Implemented
SF0510 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $1,192 $3,095 Implemented
SD0555 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,771 $1,100 Implemented
SD0555 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $489 $600 Implemented
SF0509 # 03 Y:2017 03 2017 INSTALL TIMERS AND/OR THERMOSTATS $17,732 $2,539 Implemented
SF0509 # 05 Y:2017 05 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,813 $10,550 Implemented
SF0509 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,416 $53,848 Implemented
SF0509 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,893 $42,428 Implemented
SF0508 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,154 $0 Implemented
SF0508 # 02 Y:2017 02 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $20,198 $2,023 Implemented
SF0508 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,954 $26,825 Implemented
SF0507 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,318 $0 Implemented
SF0507 # 02 Y:2017 02 2017 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $7,895 $560 Implemented
SF0507 # 03 Y:2017 03 2017 REPAIR AND ELIMINATE STEAM LEAKS $1,567 $156 Implemented
SF0507 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $8,398 $3,902 Implemented
SF0507 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $116,456 $172,681 Implemented