IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,631

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0911 # 05 Y:2014 05 2014 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $14,978 $20,079 Implemented
UD0911 # 06 Y:2014 06 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $74,000 $124,534 Implemented
UD0911 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,256 $47,188 Implemented
UD0910 # 01 Y:2014 01 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $235 $0 Implemented
UD0910 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $10,400 $10,000 Implemented
UD0910 # 07 Y:2014 07 2014 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $11,334 $18,902 Implemented
UD0910 # 08 Y:2014 08 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $377,548 $1,083,820 Implemented
UD0910 # 10 Y:2014 10 2014 REUSE / RECYCLE/ SELL PAPER PRODUCTS $22,280 $0 Implemented
UD0910 # 11 Y:2014 11 2014 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $8,744 $12,000 Implemented
UD0909 # 02 Y:2014 02 2014 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,680 $1,125 Implemented
UD0909 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $667 $2,940 Implemented
UD0909 # 06 Y:2014 06 2014 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,214 $5,000 Implemented
UD0909 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,032 $1,000 Implemented
UD0909 # 09 Y:2014 09 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $797 $0 Implemented
UD0909 # 10 Y:2014 10 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $797 $0 Implemented
WV0495 # 04 Y:2014 04 2014 INSTALL SET-BACK TIMERS $10,203 $4,200 Implemented
WV0495 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,578 $7,154 Implemented
WV0495 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $5,177 $5,764 Implemented
WV0495 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,890 $5,211 Implemented
WV0495 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,156 $725 Implemented
WV0494 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,532 $51,000 Implemented
WV0494 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,592 $1,010 Implemented
WV0494 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,724 $158 Implemented
WV0494 # 05 Y:2014 05 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,708 $6,552 Implemented
WV0494 # 06 Y:2014 06 2014 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,149 $96 Implemented