Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,421
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0365 # 04 Y:1996 | 04 | 1996 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $4,290 | $0 | Implemented |
MA0365 # 05 Y:1996 | 05 | 1996 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,173 | $876 | Implemented |
MA0365 # 07 Y:1996 | 07 | 1996 | COMBINE UTILITY METERS | $420 | $0 | Implemented |
MA0364 # 07 Y:1996 | 07 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $477 | $1,100 | Implemented |
MA0364 # 09 Y:1996 | 09 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $297 | $0 | Implemented |
MA0362 # 01 Y:1996 | 01 | 1996 | USE EXISTING DAM TO GENERATE ELECTRICITY | $109,702 | $40,000 | Implemented |
MA0362 # 02 Y:1996 | 02 | 1996 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $30,286 | $11,000 | Implemented |
MA0362 # 04 Y:1996 | 04 | 1996 | INSTALL / REPAIR INSULATION ON STEAM LINES | $18,658 | $18,595 | Implemented |
MA0362 # 06 Y:1996 | 06 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,026 | $14,436 | Implemented |
MA0361 # 01 Y:1996 | 01 | 1996 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,187 | $2,640 | Implemented |
MA0361 # 02 Y:1996 | 02 | 1996 | REPAIR OR REPLACE STEAM TRAPS | $5,482 | $3,408 | Implemented |
MA0361 # 04 Y:1996 | 04 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,759 | $1,400 | Implemented |
MA0361 # 05 Y:1996 | 05 | 1996 | INSTALL TIMERS AND/OR THERMOSTATS | $5,189 | $4,200 | Implemented |
MA0361 # 07 Y:1996 | 07 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $432 | $0 | Implemented |
MA0361 # 08 Y:1996 | 08 | 1996 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $304 | $79 | Implemented |
MA0356 # 01 Y:1996 | 01 | 1996 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $29,400 | $118,450 | Implemented |
MA0356 # 02 Y:1996 | 02 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,644 | $3,000 | Implemented |
MA0356 # 03 Y:1996 | 03 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,838 | $0 | Implemented |
MA0354 # 01 Y:1996 | 01 | 1996 | USE RADIANT HEATER FOR SPOT HEATING | $23,668 | $72,000 | Implemented |
MA0354 # 04 Y:1996 | 04 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $613 | $200 | Implemented |
MA0347 # 03 Y:1995 | 03 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,154 | $8,175 | Implemented |
MA0347 # 06 Y:1995 | 06 | 1995 | FILTER AND REUSE HYDRAULIC OIL | $29,912 | $51,750 | Implemented |
MA0342 # 01 Y:1995 | 01 | 1995 | OPTIMIZE PLANT POWER FACTOR | $10,527 | $8,100 | Implemented |
MA0342 # 04 Y:1995 | 04 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,836 | $0 | Implemented |
MA0342 # 05 Y:1995 | 05 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,525 | $3,443 | Implemented |