IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,631

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0476 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,046 $26,555 Implemented
WV0476 # 02 Y:2013 02 2013 INSTALL TIMERS AND/OR THERMOSTATS $13,346 $4,200 Implemented
WV0476 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $845 $1,940 Implemented
WV0476 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $595 $1,431 Implemented
WV0476 # 10 Y:2013 10 2013 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $301 $90 Implemented
WV0476 # 11 Y:2013 11 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $259 $140 Implemented
WV0476 # 12 Y:2013 12 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $251 $50 Implemented
UD0890 # 01 Y:2013 01 2013 BURN A LESS EXPENSIVE GRADE OF FUEL $544,478 $0 Implemented
UD0890 # 03 Y:2013 03 2013 CHECK FOR ACCURACY OF UTILITY / POWER METERS $37,340 $0 Implemented
UD0890 # 04 Y:2013 04 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $136,711 $0 Implemented
UD0890 # 06 Y:2013 06 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,216 $0 Implemented
UD0890 # 07 Y:2013 07 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $37,438 $6,000 Implemented
UD0890 # 08 Y:2013 08 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,203 $0 Implemented
UD0889 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,100 $0 Implemented
UD0889 # 02 Y:2013 02 2013 DEVELOP A REPAIR/REPLACE POLICY $654 $460 Implemented
UD0887 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,553 $50 Implemented
UD0887 # 02 Y:2013 02 2013 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,438 $0 Implemented
UD0887 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $497 $500 Implemented
UD0887 # 04 Y:2013 04 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $8,763 $2,075 Implemented
UD0887 # 06 Y:2013 06 2013 ADD AREA LIGHTING SWITCHES $594 $350 Implemented
UD0887 # 11 Y:2013 11 2013 DEVELOP A REPAIR/REPLACE POLICY $2,637 $3,420 Implemented
UD0887 # 13 Y:2013 13 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $383 $0 Implemented
UD0886 # 07 Y:2013 07 2013 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $36,728 $14,900 Implemented
UD0886 # 11 Y:2013 11 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $341 $0 Implemented
UD0886 # 12 Y:2013 12 2013 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,648 $6,720 Implemented