Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,405

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0383 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,257 $740 Implemented
WI0362 # 05 Y:2000 05 2000 TREAT AND REUSE RINSE WATERS $3,598 $6,375 Implemented
WI0353 # 04 Y:1999 04 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $6,159 $22,000 Implemented
WI0353 # 05 Y:1999 05 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,879 $0 Implemented
WI0353 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,440 $640 Implemented
WI0349 # 03 Y:1999 03 1999 INSTALL TIMERS AND/OR THERMOSTATS $2,784 $800 Implemented
WI0349 # 05 Y:1999 05 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,927 $500 Implemented
WI0349 # 07 Y:1999 07 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,649 $0 Implemented
WI0345 # 04 Y:1999 04 1999 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $8,207 $500 Implemented
WI0345 # 09 Y:1999 09 1999 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,562 $500 Implemented
WI0345 # 10 Y:1999 10 1999 INSTALL TIMERS AND/OR THERMOSTATS $1,014 $1,400 Implemented
WI0345 # 11 Y:1999 11 1999 INSTALL OCCUPANCY SENSORS $788 $2,400 Implemented
WI0344 # 01 Y:1999 01 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $32,000 $2,800 Implemented
WI0344 # 03 Y:1999 03 1999 METER WASTE WATER $3,128 $1,000 Implemented
WI0343 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,468 $60 Implemented
WI0342 # 04 Y:1999 04 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $757 $500 Implemented
WI0342 # 05 Y:1999 05 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $605 $959 Implemented
WI0341 # 03 Y:1999 03 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,404 $8,000 Implemented
WI0341 # 04 Y:1999 04 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $648 $1,086 Implemented
WI0341 # 07 Y:1999 07 1999 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,647 $300 Implemented
WI0341 # 08 Y:1999 08 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $1,475 $0 Implemented
WI0340 # 01 Y:1999 01 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,153 $30,618 Implemented
WI0340 # 04 Y:1999 04 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,051 $0 Implemented
WI0340 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,340 $2,000 Implemented
WI0340 # 07 Y:1999 07 1999 INSTALL OCCUPANCY SENSORS $470 $150 Implemented