IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,400

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0654 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $737 $150 Implemented
GT0654 # 05 Y:1998 05 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $200 $0 Implemented
GT0654 # 06 Y:1998 06 1998 PAY UTILITY BILLS ON TIME $1,330 $0 Implemented
GT0654 # 08 Y:1998 08 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $3,740 $5,000 Implemented
GT0653 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,810 $600 Implemented
GT0653 # 04 Y:1998 04 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $384 $0 Implemented
GT0653 # 06 Y:1998 06 1998 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $8,980 $31,660 Implemented
GT0653 # 07 Y:1998 07 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $370,000 $100,000 Implemented
GT0647 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,309 $3,080 Implemented
GT0647 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $645 $2,200 Implemented
GT0648 # 04 Y:1998 04 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $7,500 $0 Implemented
GT0648 # 05 Y:1998 05 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,000 $1,000 Implemented
GT0646 # 04 Y:1998 04 1998 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,020 $2,700 Implemented
GT0646 # 05 Y:1998 05 1998 INSTALL TIMERS AND/OR THERMOSTATS $2,730 $10,050 Implemented
GT0646 # 06 Y:1998 06 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,230 $400 Implemented
GT0645 # 01 Y:1998 01 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $20,559 $10,000 Implemented
GT0645 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,810 $7,000 Implemented
GT0645 # 04 Y:1998 04 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $34,362 $22,000 Implemented
GT0644 # 01 Y:1998 01 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $303 $0 Implemented
GT0644 # 03 Y:1998 03 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $6,251 $0 Implemented
GT0644 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,160 $750 Implemented
GT0644 # 09 Y:1998 09 1998 CONDENSE OPERATION INTO ONE BUILDING $6,516 $0 Implemented
GT0641 # 02 Y:1998 02 1998 USE SYNTHETIC LUBRICANT $1,162 $0 Implemented
GT0641 # 04 Y:1998 04 1998 REVISE RAW MATERIAL SPECS $14,100 $0 Implemented
GT0641 # 05 Y:1998 05 1998 RECOVER AND REUSE WASTE MATERIAL $2,640 $0 Implemented