Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,643
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0067 # 04 Y:1992 | 04 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $352 | $1,008 | Implemented |
AS0067 # 05 Y:1992 | 05 | 1992 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $264,625 | $2,031,000 | Implemented |
AS0067 # 06 Y:1992 | 06 | 1992 | INSULATE BARE EQUIPMENT | $264 | $280 | Implemented |
AS0067 # 07 Y:1992 | 07 | 1992 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,838 | $7,000 | Implemented |
AS0067 # 08 Y:1992 | 08 | 1992 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,956 | $19,000 | Implemented |
AS0067 # 09 Y:1992 | 09 | 1992 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $2,518 | $5,000 | Implemented |
AS0066 # 01 Y:1992 | 01 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,219 | $4,230 | Implemented |
AS0066 # 02 Y:1992 | 02 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,749 | $0 | Implemented |
AS0066 # 03 Y:1992 | 03 | 1992 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,062 | $4,836 | Implemented |
AS0066 # 04 Y:1992 | 04 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,140 | $7,221 | Implemented |
AS0066 # 05 Y:1992 | 05 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,921 | $7,200 | Implemented |
AS0066 # 06 Y:1992 | 06 | 1992 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,845 | $0 | Implemented |
AS0066 # 07 Y:1992 | 07 | 1992 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $384 | $800 | Implemented |
AS0066 # 08 Y:1992 | 08 | 1992 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $739 | $500 | Implemented |
AS0066 # 09 Y:1992 | 09 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,623 | $200 | Implemented |
AS0066 # 10 Y:1992 | 10 | 1992 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $206,000 | $800,000 | Implemented |
AS0061 # 01 Y:1992 | 01 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,012 | $24,872 | Implemented |
AS0061 # 02 Y:1992 | 02 | 1992 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $345,320 | $530,000 | Implemented |
AS0061 # 03 Y:1992 | 03 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,583 | $8,109 | Implemented |
AS0061 # 04 Y:1992 | 04 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,446 | $3,248 | Implemented |
AS0061 # 05 Y:1992 | 05 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,462 | $7,288 | Implemented |
AS0061 # 06 Y:1992 | 06 | 1992 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $236,795 | $750,000 | Implemented |
AS0061 # 07 Y:1992 | 07 | 1992 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $107,027 | $6,700 | Implemented |
AS0061 # 08 Y:1992 | 08 | 1992 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $129,176 | $640,000 | Implemented |
AS0061 # 09 Y:1992 | 09 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,933 | $2,000 | Implemented |