IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,631

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0774 # 11 Y:2008 11 2008 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $3,078 $0 Implemented
UD0771 # 06 Y:2007 06 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,180 $0 Implemented
UD0771 # 09 Y:2007 09 2007 DISCONNECT BALLASTS $304 $0 Implemented
WV0366 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,251 $20,735 Implemented
WV0366 # 02 Y:2007 02 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,342 $0 Implemented
WV0366 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,238 $5,148 Implemented
WV0366 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,696 $1,315 Implemented
WV0366 # 08 Y:2007 08 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,400 $1,050 Implemented
WV0366 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,252 $0 Implemented
WV0366 # 10 Y:2007 10 2007 DEVELOP A REPAIR/REPLACE POLICY $2,440 $898 Implemented
WV0366 # 16 Y:2007 16 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $667 $282 Implemented
UD0770 # 01 Y:2007 01 2007 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $309,378 $0 Implemented
UD0770 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,879 $52,520 Implemented
UD0770 # 03 Y:2007 03 2007 INSTALL TIMERS AND/OR THERMOSTATS $40,049 $2,700 Implemented
UD0770 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,512 $2,280 Implemented
UD0770 # 07 Y:2007 07 2007 INSTALL SKYLIGHTS $8,153 $30,000 Implemented
UD0770 # 08 Y:2007 08 2007 DEVELOP A REPAIR/REPLACE POLICY $7,672 $42,117 Implemented
UD0770 # 09 Y:2007 09 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,139 $300 Implemented
UD0770 # 10 Y:2007 10 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,532 $0 Implemented
UD0770 # 11 Y:2007 11 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $448 $5,050 Implemented
UM0332 # 02 Y:2007 02 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $56,464 $1,000 Implemented
UM0332 # 03 Y:2007 03 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $45,783 $500 Implemented
UM0332 # 04 Y:2007 04 2007 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $26,141 $12,385 Implemented
UM0332 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,954 $638 Implemented
UD0768 # 07 Y:2007 07 2007 UPGRADE CONTROLS ON COMPRESSORS $2,180 $0 Implemented