IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,075

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0285 # 03 Y:1986 03 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $9,667 $1,955 Implemented
TN0285 # 04 Y:1986 04 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,628 $0 Implemented
TN0285 # 06 Y:1986 06 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,677 $6,720 Implemented
TN0285 # 07 Y:1986 07 1986 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,825 $1,480 Implemented
TN0285 # 10 Y:1986 10 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,515 $0 Implemented
TN0279 # 05 Y:1986 05 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,339 $0 Implemented
TN0280 # 01 Y:1986 01 1986 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $3,536 $815 Implemented
TN0280 # 03 Y:1986 03 1986 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,837 $10,750 Implemented
TN0280 # 04 Y:1986 04 1986 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,539 $2,750 Implemented
TN0280 # 07 Y:1986 07 1986 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $259 $275 Implemented
TN0281 # 01 Y:1986 01 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $6,608 $4,408 Implemented
TN0281 # 05 Y:1986 05 1986 ADJUST VENTS TO MINIMIZE ENERGY USE $3,340 $0 Implemented
TN0281 # 07 Y:1986 07 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,025 $105 Implemented
TN0281 # 10 Y:1986 10 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $93 $0 Implemented
TN0275 # 05 Y:1986 05 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,628 $375 Implemented
TN0275 # 06 Y:1986 06 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,571 $1,300 Implemented
TN0276 # 01 Y:1986 01 1986 INSULATE BARE EQUIPMENT $4,831 $95 Implemented
TN0276 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,382 $0 Implemented
TN0276 # 04 Y:1986 04 1986 INSULATE BARE EQUIPMENT $566 $1,851 Implemented
TN0276 # 06 Y:1986 06 1986 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $373 $500 Implemented
TN0276 # 07 Y:1986 07 1986 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $122 $600 Implemented
TN0276 # 08 Y:1986 08 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $311 $45 Implemented
TN0272 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,110 $750 Implemented
TN0272 # 03 Y:1986 03 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,861 $440 Implemented
TN0272 # 04 Y:1986 04 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $576 $448 Implemented