IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,171

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0403 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $7,904 $4,620 Implemented
MA0400 # 03 Y:1997 03 1997 COVER OPEN TANKS $15,677 $6,578 Implemented
MA0400 # 05 Y:1997 05 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $388 $0 Implemented
HO0162 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,888 $9,937 Implemented
HO0162 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,465 $800 Implemented
HO0162 # 06 Y:1997 06 1997 COVER INK CONTAINERS WHEN NOT IN USE $337 $0 Implemented
HO0160 # 06 Y:1997 06 1997 PURCHASE EQUIPMENT INSTEAD OF LEASING $55,900 $15,000 Implemented
HO0158 # 03 Y:1997 03 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,827 $0 Implemented
HO0158 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $621 $600 Implemented
HO0158 # 05 Y:1997 05 1997 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $2,500 $1,000 Implemented
HO0156 # 07 Y:1997 07 1997 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $28,080 $500 Implemented
HO0151 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,364 $5,745 Implemented
HO0151 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $375 $400 Implemented
HO0150 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $791 $700 Implemented
HO0150 # 03 Y:1997 03 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $413 $310 Implemented
HO0150 # 08 Y:1997 08 1997 USE RADIANT HEATER FOR SPOT HEATING $956 $3,000 Implemented
HO0150 # 09 Y:1997 09 1997 MINIMIZE WATER USAGE $390 $100 Implemented
HO0148 # 01 Y:1997 01 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,488 $2,196 Implemented
HO0148 # 02 Y:1997 02 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,600 $250 Implemented
HO0148 # 03 Y:1997 03 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $9,425 $5,000 Implemented
HO0148 # 06 Y:1997 06 1997 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $10,000 $10,000 Implemented
HO0148 # 07 Y:1997 07 1997 APPLY FOR INVESTMENT INCENTIVES $8,676 $100 Implemented
HO0146 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $616 $500 Implemented
HO0146 # 04 Y:1997 04 1997 INSULATE BARE EQUIPMENT $16,827 $7,700 Implemented
HO0146 # 06 Y:1997 06 1997 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $104,000 $0 Implemented