Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,686
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0508 # 03 Y:2013 | 03 | 2013 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $2,845 | $1,000 | Implemented |
IA0508 # 04 Y:2013 | 04 | 2013 | OPTIMIZE PLANT POWER FACTOR | $6,113 | $6,000 | Implemented |
IA0508 # 05 Y:2013 | 05 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $689 | $1,590 | Implemented |
IA0508 # 08 Y:2013 | 08 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,512 | $1,000 | Implemented |
IA0508 # 09 Y:2013 | 09 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,758 | $976 | Implemented |
IA0507 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,483 | $4,993 | Implemented |
IA0507 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,279 | $1,198 | Implemented |
IA0507 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $2,933 | $2,826 | Implemented |
IA0507 # 04 Y:2013 | 04 | 2013 | INSULATE BARE EQUIPMENT | $9,686 | $7,803 | Implemented |
IA0507 # 05 Y:2013 | 05 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,342 | $1,000 | Implemented |
IA0507 # 07 Y:2013 | 07 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $792 | $650 | Implemented |
IA0507 # 08 Y:2013 | 08 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $576 | $25 | Implemented |
IA0507 # 09 Y:2013 | 09 | 2013 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $4,196 | $10,318 | Implemented |
IA0507 # 10 Y:2013 | 10 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,053 | $13,600 | Implemented |
IA0506 # 03 Y:2013 | 03 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $932 | $500 | Implemented |
IA0506 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,271 | $10,035 | Implemented |
IA0506 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $751 | $4,480 | Implemented |
IA0506 # 06 Y:2013 | 06 | 2013 | INSTALL OCCUPANCY SENSORS | $444 | $1,450 | Implemented |
IA0506 # 07 Y:2013 | 07 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $830 | $177 | Implemented |
IA0503 # 03 Y:2013 | 03 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $975 | $2,238 | Implemented |
IA0503 # 05 Y:2013 | 05 | 2013 | OPTIMIZE PLANT POWER FACTOR | $15,108 | $8,304 | Implemented |
IA0503 # 06 Y:2013 | 06 | 2013 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,063 | $2,204 | Implemented |
IA0502 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,996 | $37,758 | Implemented |
IA0502 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,777 | $405 | Implemented |
IA0502 # 03 Y:2013 | 03 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,859 | $205 | Implemented |