IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,331

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0073 # 06 Y:2011 06 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $16,120 $0 Implemented
MZ0073 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $638 $760 Implemented
MZ0073 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,698 $850 Implemented
MZ0073 # 07 Y:2011 07 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,750 $0 Implemented
MA0685 # 04 Y:2011 04 2011 REDUCE VENTILATION AIR $2,713 $6,300 Implemented
MZ0073 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,698 $0 Implemented
MA0685 # 03 Y:2011 03 2011 OPTIMIZE PLANT POWER FACTOR $3,520 $9,425 Implemented
DL0078 # 07 Y:2011 07 2011 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $77,835 $42,650 Implemented
CO0653 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,630 $800 Implemented
UA0071 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $2,105 $2,719 Implemented
UA0071 # 03 Y:2011 03 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $31,348 $0 Implemented
UA0069 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,865 $24,690 Implemented
WV0439 # 11 Y:2011 11 2011 INSULATE BARE EQUIPMENT $4,234 $972 Implemented
WV0439 # 10 Y:2011 10 2011 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,477 $144 Implemented
WV0439 # 14 Y:2011 14 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,083 $3,000 Implemented
WV0439 # 15 Y:2011 15 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $631 $1,000 Implemented
UD0845 # 03 Y:2011 03 2011 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $4,285 $4,000 Implemented
UD0845 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $534 $0 Implemented
WV0439 # 06 Y:2011 06 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $20,648 $4,000 Implemented
WV0439 # 08 Y:2011 08 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,735 $96 Implemented
WV0439 # 09 Y:2011 09 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,194 $468 Implemented
WV0439 # 04 Y:2011 04 2011 DEVELOP A REPAIR/REPLACE POLICY $23,664 $1,202 Implemented
CO0652 # 01 Y:2011 01 2011 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $11,990 $34,320 Implemented
CO0652 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,100 $870 Implemented
WV0438 # 04 Y:2011 04 2011 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $14,539 $4,000 Implemented