IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,321

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0606 # 08 Y:1996 08 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,074 $10,500 Implemented
DS0075 # 06 Y:1996 06 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,520 $0 Implemented
DS0075 # 05 Y:1996 05 1996 INSTALL SET-BACK TIMERS $2,926 $150 Implemented
DS0075 # 03 Y:1996 03 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,576 $8,500 Implemented
DS0075 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,487 $21,753 Implemented
DS0075 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $2,348 $1,700 Implemented
GT0605 # 01 Y:1996 01 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,246 $675 Implemented
GT0605 # 02 Y:1996 02 1996 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,110 $3,500 Implemented
GT0605 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $3,308 $103 Implemented
GT0605 # 04 Y:1996 04 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,090 $1,450 Implemented
GT0605 # 05 Y:1996 05 1996 METER WASTE WATER $14,720 $0 Implemented
GT0605 # 06 Y:1996 06 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,120 $4,300 Implemented
GT0605 # 07 Y:1996 07 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,000 $4,908 Implemented
GT0605 # 09 Y:1996 09 1996 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $260,000 $49,800 Implemented
UD0508 # 10 Y:1996 10 1996 RECOVER AND REUSE COOLING WATER $5,108 $5,000 Implemented
UD0508 # 09 Y:1996 09 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,158 $2,286 Implemented
UD0508 # 08 Y:1996 08 1996 $135,600 $222,868 Implemented
UD0508 # 07 Y:1996 07 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $101,584 $40,000 Implemented
UD0508 # 06 Y:1996 06 1996 ELIMINATE/REDUCE AN OPERATION $8,523 $0 Implemented
UD0508 # 04 Y:1996 04 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $31,719 $11,000 Implemented
UD0508 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,041 $8,081 Implemented
UD0508 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,088 $2,314 Implemented
UD0508 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $7,200 $60,000 Implemented
CO0379 # 01 Y:1996 01 1996 $37,440 $48,250 Implemented
CO0379 # 02 Y:1996 02 1996 $32,640 $3,000 Implemented