IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,483

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0629 # 05 Y:2008 05 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $450 $1,620 Implemented
MA0629 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $351 $400 Implemented
MA0629 # 07 Y:2008 07 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $247 $200 Implemented
GT0846 # 01 Y:2008 01 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $61,777 $40,000 Implemented
GT0846 # 02 Y:2008 02 2008 USE MINIMUM STEAM OPERATING PRESSURE $16,146 $15,536 Implemented
GT0846 # 06 Y:2008 06 2008 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $59,040 $65,000 Implemented
GT0846 # 07 Y:2008 07 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $155,720 $30,000 Implemented
GT0846 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,504 $70,103 Implemented
SU0264 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $31,297 $0 Implemented
SU0264 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,015 $200 Implemented
SU0264 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,415 $24,120 Implemented
MA0627 # 01 Y:2008 01 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $52,302 $35,000 Implemented
MA0627 # 02 Y:2008 02 2008 REDUCE VENTILATION AIR $8,813 $16,000 Implemented
MA0627 # 03 Y:2008 03 2008 OPTIMIZE PLANT POWER FACTOR $6,984 $8,550 Implemented
MA0627 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $948 $1,000 Implemented
LL0287 # 03 Y:2008 03 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,155 $456 Implemented
LL0287 # 04 Y:2008 04 2008 INSTALL OCCUPANCY SENSORS $1,821 $60 Implemented
SD0403 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $148,069 $13,073 Implemented
SD0403 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,157 $15,033 Implemented
SD0403 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,381 $13,275 Implemented
BD0339 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $83 $35 Implemented
BD0339 # 04 Y:2008 04 2008 USE SYNTHETIC LUBRICANT $116 $76 Implemented
BD0339 # 07 Y:2008 07 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,766 $9,021 Implemented
IA0418 # 01 Y:2008 01 2008 INSULATE BARE EQUIPMENT $456 $252 Implemented
IA0418 # 02 Y:2008 02 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $228 $244 Implemented