IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,467

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0337 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $88,374 $59,360 Implemented
LL0337 # 05 Y:2010 05 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,875 $1,650 Implemented
OR0563 # 02 Y:2010 02 2010 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $219,003 $250,000 Implemented
OR0563 # 03 Y:2010 03 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,600 $244,000 Implemented
OR0562 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,447 $2,500 Implemented
OR0562 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,447 $2,724 Implemented
OR0562 # 04 Y:2010 04 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,192 $0 Implemented
SF0390 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,708 $0 Implemented
SF0390 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,828 $0 Implemented
SF0390 # 03 Y:2010 03 2010 AIR CONDITION ONLY SPACE NECESSARY $14,706 $3,207 Implemented
SF0390 # 04 Y:2010 04 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,023 $1,764 Implemented
SF0390 # 05 Y:2010 05 2010 INSULATE BARE EQUIPMENT $24,404 $7,250 Implemented
SF0390 # 06 Y:2010 06 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,991 $789 Implemented
SF0390 # 07 Y:2010 07 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,024 $5,560 Implemented
SF0390 # 11 Y:2010 11 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,039 $2,749 Implemented
SF0390 # 12 Y:2010 12 2010 USE COMPRESSOR AIR FILTERS $2,168 $3,000 Implemented
SF0390 # 13 Y:2010 13 2010 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $39,251 $58,106 Implemented
SF0390 # 15 Y:2010 15 2010 USE PHOTOCELL CONTROLS $1,030 $2,587 Implemented
SF0390 # 18 Y:2010 18 2010 OPTIMIZE PLANT POWER FACTOR $5,696 $21,908 Implemented
LL0336 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $26,938 $6,840 Implemented
LL0336 # 04 Y:2010 04 2010 $3,008 $630 Implemented
LL0336 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $1,947 $2,100 Implemented
WV0417 # 04 Y:2010 04 2010 DEVELOP A REPAIR/REPLACE POLICY $6,314 $1,220 Implemented
WV0417 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,811 $46,085 Implemented
WV0417 # 03 Y:2010 03 2010 INSULATE BARE EQUIPMENT $10,416 $8,214 Implemented