IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,627

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0241 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,151 $4,125 Implemented
MZ0241 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,321 $100,150 Implemented
MZ0241 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,218 $1,820 Implemented
MZ0241 # 03 Y:2017 03 2017 RECOVER WASTE HEAT FROM EQUIPMENT $2,547 $4,050 Implemented
MZ0241 # 02 Y:2017 02 2017 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,238 $3,570 Implemented
MZ0241 # 01 Y:2017 01 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $326 $0 Implemented
TT0200 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,772 $1,000 Implemented
TT0200 # 02 Y:2017 02 2017 INSTALL TIMERS AND/OR THERMOSTATS $9,558 $46,250 Implemented
TR0005 # 11 Y:2017 11 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,882 $25,954 Implemented
TR0005 # 10 Y:2017 10 2017 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $8,320 $966 Implemented
TR0005 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $287 $494 Implemented
TR0005 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $223 $399 Implemented
TR0005 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,836 $8,821 Implemented
TR0005 # 05 Y:2017 05 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $15,338 $56,000 Implemented
TR0005 # 01 Y:2017 01 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,452 $6,500 Implemented
TR0005 # 03 Y:2017 03 2017 CHANGE METHOD OF DEIONIZED WATER PRODUCTION $258,000 $292,000 Implemented
TR0005 # 04 Y:2017 04 2017 METER WASTE WATER $11,708 $2,650 Implemented
AS0447 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $827 $80 Implemented
AM0741 # 04 Y:2017 04 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $560 $160 Implemented
AM0741 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,210 $10 Implemented
AM0741 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,260 $500 Implemented
IP0093 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,092 $0 Implemented
IP0093 # 02 Y:2017 02 2017 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,245 $0 Implemented
IP0093 # 01 Y:2017 01 2017 PAY BILLS ON TIME TO AVOID LATE FEES $4,308 $0 Implemented
GT0909 # 05 Y:2017 05 2017 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $49,838 $321,120 Implemented