IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

305

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0844 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $5,525 $7,135 Not Implemented
MA0844 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $574 $2,100 Not Implemented
MA0844 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $9,380 $10,000 Not Implemented
MA0844 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,466 $23,175 Implemented
MA0844 # 04 Y:2022 04 2022 RECOVER WASTE HEAT FROM EQUIPMENT $853 $4,200 Not Implemented
MA0844 # 05 Y:2022 05 2022 INSULATE BARE EQUIPMENT $597 $895 Not Implemented
MA0823 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $76,578 $123,800 Not Implemented
MA0823 # 02 Y:2020 02 2020 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $111,102 $465,300 Not Implemented
MA0823 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,388 $2,000 Not Implemented
MA0823 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,327 $36,850 Not Implemented
MA0823 # 01 Y:2020 01 2020 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $757,206 $3,776,148 Not Implemented
MA0772 # 07 Y:2017 07 2017 INSTALL OCCUPANCY SENSORS $32 $144 Not Implemented
MA0772 # 04 Y:2017 04 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $602 $20 Not Implemented
MA0772 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,553 $10,235 Not Implemented
MA0772 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,550 $7,200 Implemented
MA0772 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $551 $300 Implemented
MA0772 # 06 Y:2017 06 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $499 $20 Implemented
MA0772 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $1,069 $3,189 Not Implemented
MA0755 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $9,821 $4,300 Not Implemented
MA0755 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,678 $6,000 Not Implemented
MA0755 # 02 Y:2016 02 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $43,907 $196,307 Not Implemented
MA0755 # 01 Y:2016 01 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $73,133 $200,000 Not Implemented
MA0755 # 03 Y:2016 03 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,196 $21,560 Implemented
MA0755 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,653 $2,955 Not Implemented
MA0734 # 03 Y:2014 03 2014 BURN A LESS EXPENSIVE GRADE OF FUEL $2,667 $2,565 Not Implemented