Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,500
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0590 # 03 Y:2017 | 03 | 2017 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,139 | $4,200 | Not Implemented |
NC0590 # 04 Y:2017 | 04 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,073 | $6,000 | Not Implemented |
NC0590 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,529 | $9,666 | Implemented |
NC0590 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,501 | $6,171 | Implemented |
NC0590 # 07 Y:2017 | 07 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $45 | $100 | Implemented |
NC0590 # 08 Y:2017 | 08 | 2017 | TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS | $48 | $65 | Implemented |
NC0590 # 09 Y:2017 | 09 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,273 | $230 | Implemented |
NC0590 # 10 Y:2017 | 10 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $1,448 | $5,865 | Implemented |
NC0586 # 01 Y:2017 | 01 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,081 | $2,500 | Implemented |
NC0586 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $308 | $200 | Implemented |
NC0586 # 03 Y:2017 | 03 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $988 | $2,500 | Implemented |
NC0586 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,873 | $9,000 | Implemented |
NC0586 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $929,030 | $400,000 | Implemented |
NC0586 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,008 | $2,890 | Implemented |
NC0586 # 07 Y:2017 | 07 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $2,834 | $4,685 | Implemented |
NC0577 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $59,300 | $135,630 | Not Implemented |
NC0577 # 02 Y:2016 | 02 | 2016 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $11,227 | $15,000 | Not Implemented |
NC0577 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $819 | $100 | Not Implemented |
NC0577 # 04 Y:2016 | 04 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,088 | $3,600 | Not Implemented |
NC0577 # 05 Y:2016 | 05 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,896 | $100 | Not Implemented |
NC0577 # 06 Y:2016 | 06 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,793 | $2,000 | Not Implemented |
NC0577 # 07 Y:2016 | 07 | 2016 | INSULATE BARE EQUIPMENT | $168 | $799 | Not Implemented |
NC0577 # 08 Y:2016 | 08 | 2016 | REPAIR AND ELIMINATE STEAM LEAKS | $106 | $200 | Not Implemented |
NC0577 # 09 Y:2016 | 09 | 2016 | TREAT AND REUSE RINSE WATERS | $5,659 | $7,720 | Not Implemented |
WV0536 # 01 Y:2016 | 01 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,902 | $82,500 | Not Implemented |