Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,059
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0446 # 03 Y:2003 | 03 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,528 | $500 | Implemented |
WI0446 # 04 Y:2003 | 04 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,093 | $1,359 | Implemented |
WI0446 # 05 Y:2003 | 05 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $1,214 | $3,500 | Not Implemented |
WI0446 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $945 | $740 | Implemented |
WI0446 # 07 Y:2003 | 07 | 2003 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $452 | $400 | Not Implemented |
WI0445 # 01 Y:2003 | 01 | 2003 | REPLACE CLOTH RAGS WITH PAPER TOWELS | $4,725 | $0 | Implemented |
WI0445 # 02 Y:2003 | 02 | 2003 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $3,022 | $10,000 | n/a |
WI0445 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,188 | $4,400 | Not Implemented |
WI0445 # 04 Y:2003 | 04 | 2003 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $1,188 | $1,000 | Not Implemented |
WI0445 # 05 Y:2003 | 05 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $1,111 | $2,500 | Not Implemented |
WI0445 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $422 | $640 | Implemented |
WI0444 # 01 Y:2003 | 01 | 2003 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $6,597 | $9,000 | Implemented |
WI0444 # 02 Y:2003 | 02 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $4,807 | $7,500 | Not Implemented |
WI0444 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,189 | $8,655 | Implemented |
WI0444 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,383 | $2,000 | Not Implemented |
WI0444 # 05 Y:2003 | 05 | 2003 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,301 | $1,424 | Not Implemented |
WI0444 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $983 | $740 | Implemented |
WI0444 # 07 Y:2003 | 07 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $683 | $600 | Not Implemented |
WI0443 # 01 Y:2003 | 01 | 2003 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $3,583 | $9,000 | Implemented |
WI0443 # 02 Y:2003 | 02 | 2003 | REDUCE EXCESSIVE BOILER BLOWDOWN | $1,964 | $4,500 | Implemented |
WI0443 # 03 Y:2003 | 03 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,215 | $500 | Implemented |
WI0443 # 04 Y:2003 | 04 | 2003 | INSTALL OCCUPANCY SENSORS | $843 | $2,500 | Not Implemented |
WI0443 # 05 Y:2003 | 05 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $421 | $640 | Implemented |
WI0443 # 06 Y:2003 | 06 | 2003 | INSTALL OCCUPANCY SENSORS | $341 | $75 | Implemented |
WI0442 # 01 Y:2003 | 01 | 2003 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $188,665 | $146,300 | Not Implemented |