IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,193

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0191 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,160 $12,637 Not Implemented
UM0191 # 02 Y:2001 02 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $29,810 $40,000 Not Implemented
UM0191 # 03 Y:2001 03 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,050 $3,150 Implemented
UM0191 # 04 Y:2001 04 2001 CONDENSE OPERATION INTO ONE BUILDING $12,695 $10,000 Not Implemented
UM0191 # 05 Y:2001 05 2001 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,708 $1,250 Not Implemented
UM0190 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $81,576 $80,632 Implemented
UM0190 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $20,468 $9,600 Not Implemented
UM0190 # 03 Y:2001 03 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $82,700 $8,000 Not Implemented
UM0190 # 04 Y:2001 04 2001 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $293,000 $360,000 Not Implemented
UM0190 # 05 Y:2001 05 2001 OPTIMIZE PLANT POWER FACTOR $20,286 $8,250 Implemented
UM0190 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,684 $1,000 Not Implemented
UM0189 # 01 Y:2001 01 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,060 $1,400 Not Implemented
UM0189 # 02 Y:2001 02 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,362 $1,500 Not Implemented
UM0189 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,120 $750 Not Implemented
UM0189 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,845 $1,284 Not Implemented
UM0189 # 05 Y:2001 05 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,900 $8,250 Not Implemented
UM0189 # 06 Y:2001 06 2001 RECOVER AND REUSE COOLING WATER $12,000 $4,400 Not Implemented
UM0189 # 07 Y:2001 07 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,250 $1,950 Not Implemented
UM0187 # 01 Y:2001 01 2001 INSULATE BARE EQUIPMENT $6,100 $800 Not Implemented
UM0187 # 02 Y:2001 02 2001 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $4,700 $2,000 Not Implemented
UM0187 # 03 Y:2001 03 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,344 $5,200 Not Implemented
UM0187 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,181 $375 Implemented
UM0187 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,279 $1,688 Implemented
UM0187 # 06 Y:2001 06 2001 RECOVER AND REUSE COOLING WATER $10,250 $2,000 Not Implemented
UM0184 # 03 Y:2001 03 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,550 $1,600 Implemented