Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,872
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0196 # 07 Y:1998 | 07 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,396 | $3,048 | Not Implemented |
IA0196 # 08 Y:1998 | 08 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $869 | $2,080 | Not Implemented |
IA0196 # 09 Y:1998 | 09 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $473 | $15 | Not Implemented |
DS0121 # 01 Y:1998 | 01 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $1,311 | $1,155 | Not Implemented |
DS0121 # 02 Y:1998 | 02 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $240 | $250 | Implemented |
DS0121 # 03 Y:1998 | 03 | 1998 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $679 | $50 | Implemented |
DS0121 # 04 Y:1998 | 04 | 1998 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $1,620 | $1,350 | Not Implemented |
DS0121 # 05 Y:1998 | 05 | 1998 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $962 | $74 | Implemented |
DS0121 # 06 Y:1998 | 06 | 1998 | MINIMIZE USE OF RAGS THROUGH WORKER TRAINING | $11,700 | $700 | Not Implemented |
DS0121 # 07 Y:1998 | 07 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $700 | $6 | Implemented |
DS0121 # 08 Y:1998 | 08 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $16,640 | $0 | Implemented |
OK0551 # 01 Y:1998 | 01 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $898 | $80,000 | Implemented |
OK0551 # 02 Y:1998 | 02 | 1998 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $29,885 | $0 | Not Implemented |
OK0551 # 03 Y:1998 | 03 | 1998 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,224 | $9,700 | Not Implemented |
OK0551 # 04 Y:1998 | 04 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,304 | $0 | Implemented |
OK0551 # 05 Y:1998 | 05 | 1998 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,522 | $0 | Implemented |
NC0143 # 01 Y:1998 | 01 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,467 | $700 | Implemented |
NC0143 # 02 Y:1998 | 02 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $50,294 | $280,937 | Not Implemented |
NC0143 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,615 | $25,600 | Not Implemented |
NC0143 # 04 Y:1998 | 04 | 1998 | REDUCE FLUID FLOW RATES | $2,040 | $2,500 | Not Implemented |
NC0143 # 05 Y:1998 | 05 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $15,191 | $30,000 | Not Implemented |
NC0143 # 06 Y:1998 | 06 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $45,561 | $55,000 | Not Implemented |
NC0142 # 01 Y:1998 | 01 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $2,463 | $1,050 | Implemented |
NC0142 # 02 Y:1998 | 02 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,239 | $0 | Implemented |
NC0142 # 03 Y:1998 | 03 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,688 | $1,200 | Implemented |