IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,184

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0362 # 07 Y:2000 07 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,034 $0 Implemented
UM0171 # 01 Y:2000 01 2000 INSTALL OCCUPANCY SENSORS $717 $3,440 Not Implemented
UM0171 # 02 Y:2000 02 2000 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $15,476 $30,000 Not Implemented
UM0171 # 03 Y:2000 03 2000 REDUCE EXCESSIVE BOILER BLOWDOWN $2,065 $4,430 Not Implemented
UM0171 # 04 Y:2000 04 2000 USE OTHER WASTE CONCENTRATION METHODS $147,018 $250,000 Not Implemented
UM0171 # 05 Y:2000 05 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $32,105 $3,600 Not Implemented
UM0171 # 06 Y:2000 06 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $187,954 $165,000 Implemented
UM0170 # 01 Y:2000 01 2000 INSTALL OCCUPANCY SENSORS $709 $1,660 Implemented
UM0170 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,147 $500 Implemented
UM0170 # 03 Y:2000 03 2000 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $185,532 $310,000 Not Implemented
UM0170 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $64,245 $22,000 Not Implemented
UM0170 # 05 Y:2000 05 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $11,573 $8,200 Not Implemented
UM0169 # 01 Y:2000 01 2000 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $15,444 $2,250 Implemented
UM0169 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $1,322 $800 Implemented
UM0169 # 03 Y:2000 03 2000 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $27,956 $8,250 Not Implemented
UM0169 # 04 Y:2000 04 2000 INSULATE BARE EQUIPMENT $13,069 $23,100 Not Implemented
UM0169 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $2,117 $500 Implemented
UM0169 # 06 Y:2000 06 2000 USE RADIANT HEATER FOR SPOT HEATING $8,102 $10,000 Implemented
UM0169 # 07 Y:2000 07 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,084 $350 Not Implemented
UM0169 # 08 Y:2000 08 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $50,433 $23,500 Implemented
UM0169 # 09 Y:2000 09 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $312,500 $860,000 Not Implemented
UM0168 # 01 Y:2000 01 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $526 $993 Implemented
UM0168 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,117 $50,000 Not Implemented
UM0168 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,945 $2,250 Implemented
UM0168 # 04 Y:2000 04 2000 UPGRADE CONTROLS ON COMPRESSORS $8,180 $300 Implemented