IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0645 # 10 Y:2002 10 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $207 $250 n/a
UM0215 # 01 Y:2002 01 2002 RECYCLE CASTING SAND $12,300 $50,000 Not Implemented
UM0215 # 02 Y:2002 02 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $1,824 $1,000 Not Implemented
UM0215 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $980 $225 Not Implemented
UM0215 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $730 $1,000 Not Implemented
UM0215 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $366 $31 Not Implemented
WI0422 # 01 Y:2002 01 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $107,793 $715,000 Not Implemented
WI0422 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $51,405 $31,028 Not Implemented
WI0422 # 03 Y:2002 03 2002 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $37,726 $40,000 Not Implemented
WI0422 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,645 $21,689 Implemented
WI0422 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $328 $0 Not Implemented
LL0137 # 01 Y:2002 01 2002 INSULATE BARE EQUIPMENT $50,444 $27,801 Not Implemented
LL0137 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $2,446 $1,992 Not Implemented
LL0137 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,946 $90 Implemented
LL0137 # 04 Y:2002 04 2002 USE PHOTOCELL CONTROLS $1,550 $104 Not Implemented
LL0137 # 05 Y:2002 05 2002 USE PHOTOCELL CONTROLS $1,123 $182 Implemented
LL0137 # 06 Y:2002 06 2002 USE PHOTOCELL CONTROLS $387 $26 Implemented
IC0037 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $873 $3,949 Not Implemented
IC0037 # 02 Y:2002 02 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $472 $440 Implemented
AS0326 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,817 $100 n/a
AS0326 # 02 Y:2002 02 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,641 $1,600 n/a
AS0326 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,936 $0 n/a
AS0326 # 04 Y:2002 04 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $11,799 $489 n/a
AS0326 # 05 Y:2002 05 2002 AUTOMATE FINISHING PROCESS $23,920 $582 n/a
AS0326 # 06 Y:2002 06 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $10,080 $750 n/a