Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,184
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0165 # 06 Y:2000 | 06 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $658 | $750 | Not Implemented |
UM0165 # 07 Y:2000 | 07 | 2000 | FILTER AND REUSE HYDRAULIC OIL | $37,145 | $10,500 | Not Implemented |
ND0350 # 01 Y:2000 | 01 | 2000 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $63,400 | $8,200 | Not Implemented |
ND0350 # 02 Y:2000 | 02 | 2000 | RECYCLE WHITE WATER | $36,888 | $0 | Not Implemented |
ND0350 # 03 Y:2000 | 03 | 2000 | REDUCE VENTILATION AIR | $15,439 | $1,000 | Implemented |
ND0350 # 04 Y:2000 | 04 | 2000 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,036 | $20 | Implemented |
ND0350 # 05 Y:2000 | 05 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,124 | $4,800 | Not Implemented |
ND0350 # 06 Y:2000 | 06 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,226 | $24,870 | Implemented |
ND0350 # 07 Y:2000 | 07 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,647 | $0 | Implemented |
ND0350 # 08 Y:2000 | 08 | 2000 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,572 | $200 | Implemented |
ND0350 # 09 Y:2000 | 09 | 2000 | INSTALL OCCUPANCY SENSORS | $721 | $800 | Not Implemented |
ND0350 # 10 Y:2000 | 10 | 2000 | USE PHOTOCELL CONTROLS | $190 | $400 | Not Implemented |
ND0350 # 11 Y:2000 | 11 | 2000 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $120 | $375 | Not Implemented |
ND0350 # 12 Y:2000 | 12 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $268 | $200 | Not Implemented |
ND0350 # 13 Y:2000 | 13 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $340 | $400 | Not Implemented |
ND0350 # 14 Y:2000 | 14 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $204 | $275 | Not Implemented |
UM0164 # 01 Y:2000 | 01 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,316 | $500 | Not Implemented |
UM0164 # 02 Y:2000 | 02 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,563 | $50 | Not Implemented |
UM0164 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,733 | $600 | Not Implemented |
UM0164 # 04 Y:2000 | 04 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $225 | $750 | Not Implemented |
UM0164 # 05 Y:2000 | 05 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,353 | $7,000 | Not Implemented |
UM0164 # 06 Y:2000 | 06 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,328 | $2,500 | Not Implemented |
UM0164 # 07 Y:2000 | 07 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $30,000 | $5,000 | Implemented |
UM0164 # 08 Y:2000 | 08 | 2000 | RECOVER AND REUSE COOLING WATER | $21,600 | $5,000 | Not Implemented |
UM0163 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,712 | $84,426 | Not Implemented |