Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,184
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0122 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $950 | $1,470 | Not Implemented |
UM0122 # 04 Y:1998 | 04 | 1998 | USE A RAG RECYCLE SERVICE | $5,818 | $0 | Not Implemented |
UM0122 # 05 Y:1998 | 05 | 1998 | METER WASTE WATER | $761 | $150 | Not Implemented |
UM0122 # 06 Y:1998 | 06 | 1998 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $29,300 | $0 | Not Implemented |
ND0297 # 01 Y:1998 | 01 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,421 | $10,400 | Implemented |
ND0297 # 02 Y:1998 | 02 | 1998 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,131 | $9,600 | Not Implemented |
ND0297 # 03 Y:1998 | 03 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,791 | $14,171 | Implemented |
ND0297 # 04 Y:1998 | 04 | 1998 | USE PHOTOCELL CONTROLS | $2,278 | $3,600 | Not Implemented |
ND0297 # 05 Y:1998 | 05 | 1998 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $868 | $250 | Not Implemented |
ND0297 # 06 Y:1998 | 06 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $410 | $180 | Implemented |
ND0297 # 07 Y:1998 | 07 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $289 | $240 | Not Implemented |
ND0297 # 08 Y:1998 | 08 | 1998 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $256 | $600 | Not Implemented |
ND0297 # 09 Y:1998 | 09 | 1998 | DISCONNECT BALLASTS | $194 | $176 | Not Implemented |
ND0297 # 10 Y:1998 | 10 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $167 | $600 | Not Implemented |
ND0297 # 11 Y:1998 | 11 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $73 | $300 | Implemented |
UM0121 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,850 | $2,048 | Implemented |
UM0121 # 02 Y:1998 | 02 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $511 | $1,000 | Implemented |
UM0121 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $761 | $990 | Implemented |
UM0121 # 04 Y:1998 | 04 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $12,085 | $6,000 | Implemented |
UM0121 # 05 Y:1998 | 05 | 1998 | USE EVAPORATION TO CONCENTRATE MATERIAL | $8,359 | $12,000 | Implemented |
UM0121 # 06 Y:1998 | 06 | 1998 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $12,017 | $11,000 | Not Implemented |
UM0121 # 07 Y:1998 | 07 | 1998 | $1,756 | $3,350 | Implemented | |
UM0119 # 01 Y:1998 | 01 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,067 | $11,283 | Implemented |
UM0119 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,659 | $30,946 | Not Implemented |
UM0119 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,816 | $1,800 | Not Implemented |