IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0449 # 06 Y:2011 06 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $697 $0 Implemented
UF0449 # 07 Y:2011 07 2011 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $3,726 $1,919 Not Implemented
UF0449 # 08 Y:2011 08 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,799 $7,128 Not Implemented
UF0449 # 09 Y:2011 09 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $659 $686 Implemented
UF0449 # 10 Y:2011 10 2011 AIR CONDITION ONLY SPACE NECESSARY $227 $21 Implemented
UF0449 # 11 Y:2011 11 2011 USE OPTIMUM THICKNESS INSULATION $1,450 $576 Not Implemented
CO0651 # 01 Y:2011 01 2011 CONDENSE OPERATION INTO ONE BUILDING $17,750 $20,000 Not Implemented
CO0651 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,300 $110 Not Implemented
CO0651 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,530 $31,210 Not Implemented
CO0651 # 04 Y:2011 04 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,470 $20,920 Not Implemented
CO0651 # 05 Y:2011 05 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,030 $90 Not Implemented
LE0329 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $76,610 $25,300 Not Implemented
LE0329 # 02 Y:2011 02 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $50,301 $8,250 Not Implemented
LE0329 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,228 $86,000 Not Implemented
LE0329 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,539 $30,000 Not Implemented
LE0329 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,298 $1,000 Not Implemented
MA0680 # 01 Y:2011 01 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,371 $45,123 Implemented
MA0680 # 02 Y:2011 02 2011 REDUCE VENTILATION AIR $3,229 $2,895 Implemented
MA0680 # 03 Y:2011 03 2011 REDUCE VENTILATION AIR $630 $2,895 Implemented
MA0680 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $265 $2,000 Not Implemented
MA0680 # 05 Y:2011 05 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $151 $0 Implemented
UA3016 # 04 Y:2011 04 2011 RECOVER WASTE HEAT FROM EQUIPMENT $7,387 $2,291 Not Implemented
UA3016 # 05 Y:2011 05 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,784 $2,000 Not Implemented
TT0081 # 01 Y:2011 01 2011 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $89,000 $24,500 Not Implemented
TT0081 # 02 Y:2011 02 2011 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $204,112 $553,850 Not Implemented